CNE Review – May 2024

Published on May 22, 2024 / Leer en español

See all editions of the
CNE Review
SHARE

In This Issue

In late March the U.S. Department of Energy (“DOE”) released the final report of its study of Puerto Rico’s electric grid and its options for implementing a transition to 100% renewable generation by 2050. The final report entitled Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (“PR100 Study”) is (1) the product of a two-year effort carried out by several of the National Laboratories in conjunction with a broad group of Puerto Rican stakeholders; (2) a comprehensive diagnostic of Puerto Rico’s electric system; and (3) a wide-ranging analysis of the challenges to attain the goal of using only renewable energy sources for the generation of electricity in Puerto Rico.

We reviewed a summary of the main findings of the PR100 Study in a prior CNE Review. This time around we want to focus on a handful of issues that we believe merit further public discussion and analysis in Puerto Rico. Specifically, we will highlight (1) the complexity of achieving the 100% goal; (2) the need to make difficult tradeoffs and hard policy decisions to execute the transition; (3) the cost of the investments required to achieve this undertaking; (4) the economic impact of this process; and (5) some risks and uncertainties that remain to be addressed.

Click here to read our full analysis.

Insights + Analysis from CNE

By Sergio M. Marxuach, Policy Director

Five years ago, Puerto Rico enacted legislation setting the ambitious goal of generating 100% of its electricity from renewable sources by 2050 even as it rebuilt its electric grid, which was devastated by Hurricane María in 2017. This is a clear and compelling objective that is worth pursuing. Yet success is not guaranteed because it is also incredibly complicated. The policy questions require analyzing theoretical, technical, and economic constraints as well as making difficult tradeoffs among and between complex economic, technical, and social objectives. In addition, the technology is still evolving. In that sense, there is a tension between the technology that is already available now and the technology that is not yet viable or commercially available.

We also need to note that the transition to 100% renewable generation has a political economy dimension, as the old technology (and those who benefitted from it) is replaced by a still evolving new one (and those who stand to gain from it). Humanity’s natural resistance to change is thus reinforced by powerful economic and financial incentives.

Furthermore, during the last five years, Puerto Rico has fallen behind schedule to meet the interim objective of 40% renewable generation by 2025 due to bureaucratic and coordination failures. We are, therefore, at a critical juncture. We still have time to rebuild our electric grid and to completely switch away from fossil fuel generation by 2050. But achieving those objectives will require strategic thinking, skilled policymaking, competent execution, tactical dexterity, the ability to act collectively over the long term, and inspired leadership—resources that have been in short supply in Puerto Rico for at least a generation. Make no mistake, this endeavor will be challenging, hard, and expensive. There will be setbacks along the way. But it is the right thing for Puerto Rico to do for the generations yet to be born. So, we better get working if we are going to make it.

Before moving on with our analysis, we note that the PR100 Study’s final report is over 800 pages long. Unfortunately, a full analysis of such a comprehensive document is well beyond the scope of this monthly newsletter. We do encourage all interested parties to take a look at the document, which has been translated into Spanish, in case they want to obtain a more detailed analysis of any issue related to the transition to 100% renewable generation.

Section 1: It’s Complicated

Sometimes in the heat of public debate, it is easy to overlook the complexity of the process Puerto Rico is undertaking as it moves towards 100% renewable generation. This is a multi-year, multi-billion dollar process, with many moving parts. Meticulous resource, technical, and economic assessments need to be made, even as the technology itself is evolving. The Puerto Rico Electric Power Authority (“PREPA”), the legacy utility that still owns both the grid and a substantial fleet of fossil fuel generation, is currently undergoing a bankruptcy-like process to restructure its financial obligations. Several old-generation plants need to be decommissioned as renewable generation and large-scale battery storage systems have to be installed and interconnected to the grid. In addition, two new players, LUMA and Genera, are currently managing and operating the electric system, while the regulatory framework is relatively new and the main regulator, the Puerto Rico Energy Bureau, has only been in existence for ten years.

Click here to read more on the following issues:

  • Priority Number One: Stabilize the Grid
  • Too Many Cooks in the Kitchen
  • There is More than One Pathway to 100% Renewable Generation

Section 2: There Are Tradeoffs

As could be expected in a project as complicated as this one, there are multiple tradeoffs involved. Sometimes those tradeoffs are explicit, while others are implicit or ambiguous.

In Chapter 12 of the PR100 Final Report, the DOE compared and contrasted different scenarios to better understand the tradeoffs among and between them.

Click here to learn more about these tradeoffs and:

  • The Impact of Lower Retail Sales
  • The Impact of Different Levels of Distributed Solar PV

Section 3: It’s Expensive

The DOE did not perform an independent analysis of the costs required to bring the electric system “back into a state of good repair, but rather rel[ied] on the FOMB’s 2023 Certified Fiscal Plan for PREPA to identify both the level of investment and the sources of funds to cover that level investment.” (PR100 Final Report, p. 407) According to the DOE analysis, recovery-related investments total $15.441 billion, which includes spending on generation, transmission, and distribution system repairs and replacements, as well as on the Tranche 1 transmission network upgrades.

Notice that the $15.441 billion amount does not include the capital investment necessary to fund new generation as well as the upgrades and extensions of the transmission and distribution (“T&D”) system required to achieve the 100% goal by 2050 (with the exception of the Tranche 1 transmission system upgrade). One independent expert estimated additional T&D capital investments between 2030 and 2035 would add up to an additional $13.6 billion. (London Economics International, Critique of Government Parties’ Assertion that the 9019 Settlement Will Not Affect Non-settling Creditors and Would Avoid a Subsequent Title III Filing by PREPA, October 30, 2019, p. 97, Document #: 1890-1) Keep that in mind as we focus on the resources identified by the DOE to finance the recovery-related investments.

Click here to read more on this topic.

Section 4: Is it Good for the Economy?

The economic impact of the transition to 100% renewable generation, as modeled by the DOE, exhibits several tradeoffs that policymakers will need to take into account: (1) between construction and maintenance jobs; (2) among and between the costs and benefits of the different technologies; and (3) between short-term losses and long-term benefits in terms of employment and household income.

Click here to learn more.

Section 5: Risks and Uncertainties

Any process as complicated as the transition to 100% renewable generation will be full of risks and uncertainties. In this section, we highlight some of the most significant in our opinion.

Click here to read more on:

  • The Challenge of Stabilizing the System
  • Coordination Problems
  • Cost/Resiliency/Reliability Tradeoffs
  • Compensation for Net Energy Metering
  • Policy and Regulatory Constraints Regarding the Contribution of Distributed PV to Achieve the Renewable Portfolio Standards (“RPS”) Goals
  • Reaching 40% RPS by 2025 Appears Unfeasible
  • Obtaining Funding for the Grid Upgrade Remains Challenging
  • PREPA’s Access to Capital Markets
  • Uncertainty Regarding Energy Efficiency Measures and Electric Vehicles
  • Risk of Grid Defection/Death Spiral

On Our Radar…

Click the image above to learn more about our upcoming event in Madrid, Spain.

Let’s Get Going: Next Steps in Puerto Rico’s Energy Transformation

Let's Get Going: Next Steps in Puerto Rico’s Energy Transformation

Published on May 21, 2024 / Leer en español

Sergio portrait
Policy Director
DOWNLOAD
SHARE

Introduction

In late March the U.S. Department of Energy (“DOE”) released the final report of its study of Puerto Rico’s electric grid and its options for implementing a transition to 100% renewable generation by 2050. The final report entitled Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (“PR100 Study”) is (1) the product of a two-year effort carried out by several of the National Laboratories in conjunction with a broad group of Puerto Rican stakeholders; (2) a comprehensive diagnostic of Puerto Rico’s electric system; and (3) a wide-ranging analysis of the challenges to attain the goal of using only renewable energy sources for the generation of electricity in Puerto Rico.

We reviewed a summary of the main findings of the PR100 Study in a prior CNE Review. This time around we want to focus on a handful of issues that we believe merit further public discussion and analysis in Puerto Rico. Specifically, we will highlight (1) the complexity of achieving the 100% goal; (2) the need to make difficult tradeoffs and hard policy decisions to execute the transition; (3) the cost of the investments required to achieve this undertaking; (4) the economic impact of this process; and (5) some risks and uncertainties that remain to be addressed.

Before moving on with our analysis, we note that the final report is over 800 pages long. Unfortunately, a full analysis of such a comprehensive document is well beyond the scope of this policy brief. We do encourage all interested parties to take a look at the document, which has been translated into Spanish, in case they want to obtain a more detailed analysis of any issue related to the transition to 100% renewable generation.

Section 1: It’s Complicated

Sometimes in the heat of public debate, it is easy to overlook the complexity of the process Puerto Rico is undertaking as it moves towards 100% renewable generation. This is a multi-year, multi-billion dollar process, with many moving parts. Meticulous resource, technical, and economic assessments need to be made, even as the technology itself is evolving. The Puerto Rico Electric Power Authority (“PREPA”), the legacy utility that still owns both the grid and a substantial fleet of fossil fuel generation, is currently undergoing a bankruptcy-like process to restructure its financial obligations. Several old-generation plants need to be decommissioned as renewable generation and large-scale battery storage systems have to be installed and interconnected to the grid. In addition, two new players, LUMA and Genera, are currently managing and operating the electric system, while the regulatory framework is relatively new and the main regulator, the Puerto Rico Energy Bureau (“PREB”), has only been in existence for ten years.

Priority Number One: Stabilize the Grid

Furthermore, Puerto Rico is starting the transition to 100% renewable generation with an electric system that is fragile and functioning well below recommended industry standards. The first priority, therefore, should be to stabilize the system and bring it up to 21st-century standards. On the generation side, the DOE found that “the current Puerto Rico grid is not reliable and needs immediate additional capacity to meet an acceptable level of performance.” (PR 100 Final Report, p. 240) With respect to the transmission system, the DOE found that “the lower-voltage (38-kV) transmission network components are insufficient to handle the projected system transitions” and 38-kV network upgrades are necessary to support the projected buildout of renewable generation. (PR 100 Final Report, p. 241) Finally, with respect to the distribution system, the DOE highlights that some “feeders as they exist in Puerto Rico today operate outside” standard voltages and several mitigating actions would have to be implemented to avoid “backfeeding” and voltage violations as significant photovoltaic (“PV”) generation is connected to the system. (PR100 Final Report, p. 347). This means that both LUMA, the grid operator, and Genera, which manages PREPA’s legacy generation fleet, need to undertake substantial remedial actions even as the system is transitioning to renewable sources of energy. It is our understanding that both LUMA and Genera are undertaking remedial measures to stabilize the electric system in the short term.

Too Many Cooks in the Kitchen

A multiplicity of government agencies and entities, at both the federal and state levels, with sometimes overlapping and partially interlocking jurisdictions add a second layer of complexity to this process. Among those agencies and entities, we find the following:

  1. The U.S. Department of Energy (“DOE”) – Carried out the PR100 Study and was also allocated $1 billion by Congress to finance distributed energy projects at the community level in Puerto Rico.
  2. The Federal Emergency Management Agency (“FEMA”) – Administers and oversees the use of $13.7 billion allocated to rebuild the electric grid.
  3. The U.S. Department of Housing and Urban Development (“HUD”) – Is in charge of administering approximately $1.9 billion in CDBG funds to upgrade Puerto Rico’s energy system.
  4. Central Office for Recovery, Reconstruction, and Resiliency (“COR3”) – The main liaison between the government of Puerto Rico and FEMA. The COR3 is technically the grantee for most federal reconstruction funding.
  5. Puerto Rico Department of Housing (“DOH”) – Administers and oversees the use of CDBG funds in Puerto Rico.
  6. Puerto Rico Energy Bureau (“PREB”) – The independent regulator of Puerto Rico’s electric system. It has a statutory mandate to regulate the generation and sale of electricity in the island; to set rates; and to plan for the efficient long-term operation of the electric system, among other important matters.
  7. Puerto Rico Electric Power Authority (“PREPA”) – Puerto Rico’s legacy utility, currently in bankruptcy and the nominal owner of the assets of Puerto Rico’s electric system.
  8. LUMA – Private manager and operator of Puerto Rico’s electric grid. In charge of authorizing interconnections to the grid and dispatching electricity.
  9. Genera – Private manager and operator of PREPA’s legacy generation assets. In charge of decommissioning existing fossil-fuel generation and coordinating the ramp-up of new renewable generation resources.
  10. AES and EcoEléctrica – Independent power producers with an aggregate generation capacity of approximately 900 MW using coal and natural gas, respectively. The AES plant is statutorily required to be shut down in 2028.
  11. Public Private Partnership Administration (“P3A”) – Executes limited oversight functions pursuant to the operation and management agreements executed with each LUMA and Genera, respectively.
  12. Financial Oversight and Management Board (“FOMB”) – Represents PREPA in its bankruptcy process. Has oversight powers over PREPA pursuant to PROMESA. Certifies PREPA’s annual Fiscal Plan and its operating budget. Exercises authority under PROMESA to review certain contracts covered by that law. In the case of PREPA, it has been in charge of reviewing the terms and conditions of the power purchase agreements between developers of utility-scale renewable generation and PREPA.
  13. The United States District Court for the District of Puerto Rico (“Federal Court”) – Has jurisdiction over PREPA’s bankruptcy under Title III of PROMESA. It will eventually determine how much PREPA’s creditors can recover from the bankrupt utility and certify a Plan of Adjustment (“POA”). The POA will affect electricity rates in so far as it provides for the imposition of a special charge to repay bondholders and PREPA is otherwise unable to generate offsetting cost savings.

In addition, there are dozens of consultants, suppliers, rooftop solar systems vendors, developers of utility-scale renewable generation sites, trade organizations, NGOs, community-based organizations, and other stakeholders with a direct interest in the transition to 100% renewable generation.

The problem we see is that there appears to be little or no coordination among and between all these actors. In our view, the PREB, as Puerto Rico’s energy regulator, should be the principal player coordinating the upgrade of the grid, the decommissioning of PREPA’s legacy assets, the ramp-up of renewable generation both on rooftops and at the utility scale, and in general making the key decisions, in consultation with the relevant stakeholders, regarding the long-term transition to 100% renewable generation by 2050.

There is More than One Pathway to 100% Renewable Generation

A third layer of complexity arises from the multiple pathways and combinations of generation technology that are least potentially available to reach the 100% goal. To briefly recapitulate, the DOE analyzed three scenarios, all based on the utilization of “mature” renewable technologies (with the exception of biodiesel to provide firm dispatchable generation towards the end of the transition period) and which vary according to (1) the amount of distributed energy resources; (2) the amount of land available for utility-scale generation (Less Land or More Land); and (3) two load forecasts (a Mid Case and a Stress Case). In addition, the DOE also took into account the level of technological development (Conservative, Moderate, or Advanced) throughout the transition period, a variable that is exogenous to Puerto Rico.

The three scenarios are:

(1) the Economic Adoption of distributed energy resources (“DERs”), which assumes the adoption of DERs is based on financial savings to home and business owners and their deployment is extended to critical infrastructure such as fire stations and hospitals;

(2) the Equitable Adoption of DERs, which assumes the deployment of DERs beyond that of Scenario 1 to include remote areas and very low-income households (defined as households earning 0%–30% of area median income); and

(3) the Maximum Adoption of DERs, which assumes deployment of DERs on all suitable rooftops.

As stated above, each scenario has four variations: Less Land or More Land (regarding land use) and Mid Case or Stress Case (regarding load), for a total of twelve scenarios. Scenarios are labeled by number, land variation, and load variation. Thus, Scenario 1LS means: Scenario 1, Economic Adoption, Less Land, Stress load.

We note that the DOE did not “examine any futures in which there is no central grid,” even under Scenario 3, which assumes the maximum adoption of DERs. (PR100 Final Report, p. 184) This means that in the world analyzed by the PR100 Study, there will always be fixed and variable costs that will have to be paid or financed in connection with the operation, maintenance, and future upgrading of a central grid.

In addition, in Scenarios 2 and 3, the DOE:

…forced in the adoption of significantly higher amounts of rooftop PV to examine the impacts of these levels of adoption. In this analysis, we did not assume how those systems would be paid for or whether any public or federal funds would be allocated to pay for them. By definition, Scenarios 2 and 3 exceed what is likely to be adopted based on bill savings and resilience savings. (PR100 Final Report, p. 185)

This means difficult tradeoffs will have to be made among and between cost, resilience, land use, and economic impact.

Section 2: There Are Tradeoffs

As could be expected in a project as complicated as this one, there are multiple tradeoffs involved. Sometimes those tradeoffs are explicit, while others are implicit or ambiguous. For example, the DOE states that “accelerating the deployment of rooftop PV and storage will therefore accelerate increased resilience. This greater building-level resilience might reduce both the urgency to restore the grid after an outage and the resilience needs for the grid system.” (PR100 Final Report, p. 186)

Now, this statement could be interpreted in one of two ways. An optimistic or positive interpretation would be that increased rooftop solar and storage systems would increase resilience so much so as to render the restoration of the grid to a second order of priority during the recovery period immediately after a natural disaster. That would open up or make funding available to attend to other priorities during the immediate recovery period.

A more pessimistic or negative interpretation would focus on the potential perverse incentives created by additional resilience. Since a large number of people and critical infrastructures would not depend on the grid, government agencies may have less urgency in restoring grid-based service to those who have no choice but to be connected to the grid. Hence, the implicit tradeoff: more resiliency for those with access to DERs may imply longer recovery times for those still connected to the grid because restoring the grid would not be as urgent or important.

In Chapter 12 of the PR100 Final Report, the DOE compared and contrasted different scenarios to better understand the tradeoffs among and between them.

The Impact of Lower Retail Sales

First, the DOE sought to “better understand the impact of differences in demand for electricity.” Combining changes in loads with the impact of DERs on utility costs, allowed the DOE to “better understand the economic implications associated with changes in retail sales.” (PR100 Final Report, p. 435) They did this by comparing the impacts of what they call “the two bookend scenarios”, namely scenario 1MS (Economic Adoption, More Land, Stress Load), which results in the highest level of retail sales by the utility, and scenario 3MM (Maximum Adoption of DERs, More Land, Mid-Case Load), which results in the lowest level of utility retail sales. The results are quite interesting.

First, as shown in the figure below, utility “retail sales [in kWhs] in 2050 drop from 2020 levels by 55% for the lowest forecast (3MM) relative to falling 10% for the highest usage forecast (1MS).” (PR100 Final Report, p. 435) This means that under the Maximum Adoption Scenario, which maximizes rooftop solar systems, electricity sales by PREPA/LUMA/Genera decline significantly, as would be expected. Total system resiliency under this scenario is also expected to be greater.


Source: PR100 Final Report, p. 436

Second, the large reduction in retail sales by the utility between these two scenarios reduces the amount of revenue collected each year by the utility, again as would be expected. However, the sharp decline in retail sales has an adverse impact on the repayment schedule of PREPA’s legacy debt as renegotiated under the POA. According to the DOE analysis, revenues under the 3MM Scenario would decline by so much, that “the repayment date [of the restructured debt] was extended by 4 years for the 3MM scenario.” (PR100 Final report, p. 436) The figure below shows this impact:

Source: PR100 Final Report, p. 436

So, here is one clear tradeoff: more resiliency under Scenario 3MM results in (1) significantly less revenues for the utility and (2) an extension of the repayment term of the legacy debt.

Third, on the positive side, lower retail sales (in kWhs) also mean lower generation costs for the utility, which should translate into lower rates. However, the reduction in costs modeled by the DOE was not equivalent to the 55% reduction in sales in 2050 between the two scenarios under analysis for two reasons.

  • First, “as renewable energy penetration increased, the utility-owned fossil resources produced less energy overall but incurred additional cycling costs to manage the variability of the utility-scale renewable resources and, in conjunction with storage resources, was required to operate in ways that provided grid services that the utility-scale renewable energy resources could not.” (PR100 Final Report, p. 437)
  • Second, “the achievement of 100% [renewable portfolio standards] RPS in 2050 forced investment in a portfolio of new resources to provide the comparable grid services required to integrate distributed PV generation.” (PR100 Final Report, p. 437)

Notice another tradeoff here: maximum deployment of DERs significantly reduces the generation costs for the utility but those savings are partially offset by the need to incur additional investments to maintain system stability and reliability over the long term.

The net impact is that while utility electricity sales decline by approximately 55%, the utility revenue requirement (what the utility must charge to cover its costs) decreases by only 24% in the lower retail sales scenario (3MM) relative to the utility revenue requirement under the scenario with the highest sales (1MS). (PR100 Final Report, p. 437) Thus, lower sales under Scenario 3MM do result in an overall reduction in generation production costs but such a reduction is significantly lower than the decrease in total utility retail sales.

Fourth, this is where things get complicated. According to the DOE:

Because utility retail sales in the 3MM scenario declined so much more than utility costs, those costs had to be spread over a much smaller sales base to keep the utility financially healthy. This resulted in an increase in retail rates between 2025, when the electric system achieved a more reliable state of operation, and 2050: moving from 37¢/kWh to 56¢/kWh for the lowest retail sales level…In contrast, the retail rate level modestly drops between 2025 and 2045 for the highest retail sales level (34¢/kWh to 32¢/kWh) and then increases as the utility achieves 100% renewable energy penetration in 2050 (37¢/kWh). (PR100 Final Report, p. 438)

Thus, as shown in the figure below, the all-in average retail is significantly higher under scenario 3MM when compared to Scenario 1MS.


Source: PR100 Final Report, p. 438

As DERs are increasingly deployed under Scenario 3MM, utility costs decrease but, as stated above, by an amount lower than the decrease in total utility sales. As fewer customers remain totally dependent on the grid, total costs have to be apportioned over a smaller customer base, which results in higher rates relative to Scenario 1MS for all those dependent on the grid.

The Impact of Different Levels of Distributed Solar PV

The decision of how many resources should be dedicated to deploying either rooftop solar systems or utility-scale PV generation is one of the most intensely debated issues in Puerto Rico right now. Advocates for rooftop solar rightly emphasize the resiliency advantages of those systems, while advocates of more investment in utility-scale generation, relative to rooftop solar, emphasize the economies of scale and lower costs associated with larger solar generation facilities. To us, it is obvious that Puerto Rico needs both kinds of systems. So, in a certain sense, this is a false choice. But here we are.

Section 12.1.3.7 of the PR100 Final Report details the result of the DOE’s analysis of three scenarios that maintain constant both land use constraints and the load forecast while allowing for different levels of distributed/utility-scale solar PV generation. Those scenarios are 1LS (Economic Adoption, Less Land, Stress Load); 2LS (Equitable Adoption, Less Land, Stress Load); and 3LS (Maximum Adoption, Less Land, Stress Load). This analysis allows the DOE to assess the economic trade-offs associated with each of these scenarios in terms of the deployment of rooftop systems versus utility-scale generation.

The first thing they notice is that “increasing levels of distributed PV adoption under NEM [Net Energy Metering] resulted in increasing distributed PV production (MWh) that could not be integrated on the distribution system without additional infrastructure investments.” (PR100 Final Study, p. 441) As shown in the figure below, this means that as soon as 2037 “distribution system upgrades in the form of storage procured under [power purchase and operating agreements] PPOAs in addition to the requirements [to meet RPS goals] began to be needed to mitigate the integration challenges by the highest distributed PV adoption scenario under NEM.” (PR100 Final Study, p. 442)


Source: PR100 Final Report, p. 442

In terms of the impact on utility-owned generation costs, the DOE found that electricity from rooftop solar systems reduced the amount of utility-scale generation resources required to meet annual energy demand “but the increased level of variability introduced into the net load profile caused offsetting integration costs.” (PR100 Final Report, p. 442)


Source: PR100 Final Report, p. 443

As shown in the figure above, utility-owned generation costs decline modestly in Scenario 3LS relative to Scenario 1LS starting in 2025. However, the decline is “not as large, in percentage terms, as the reduction in retail sales between the two scenarios.” (PR100 Final Report, p. 442) Furthermore, (1) purchased power costs were “nearly identical” across all three scenarios and (2) starting in 2040, “both utility-owned generation and purchased power cost reductions were much smaller, in percentage terms, than the change in retail sales reductions from distributed PV between the highest and lowest level of distributed PV adoption.” (PR100 Final Report, p. 443)


Source: PR100 Final Report, p. 443

Finally, “at the levels of distributed PV penetration seen in the 3LS scenario, the utility incurred substantially more distributed PV integration costs under NEM that offset nearly all the savings from the lower electricity demand.” (PR100 Final Report, p. 443)

Just like in the previous analysis, the lower generation costs were offset by higher distribution system storage/battery costs required for the highest level of distributed PV under NEM. “As a result the total revenue requirement under the highest penetration level of distributed PV was only 1% lower than it is for the lowest penetration of distributed PV in 2050.” This means that the utility revenue requirement is essentially the same under the three scenarios, as shown in the figure below:


Source: PR100 Final Report, p. 444

 

Finally, “with nearly identical total revenue requirements, the 21% reduction in retail sales (1LS scenario versus 3LS scenario) in 2050 caused rates to be higher by 26” by 2050. See figure below.


Source: PR100 Final Report, p. 444

The tradeoffs, then, are very similar to those in the prior analysis of the “bookend scenarios.” In general, under Scenario 3 relative to Scenario 1 (with both land use constraints and loads held constant): (1) the system is more resilient as there is greater deployment of DERs; (2) retail sales (in kWh) decrease significantly; (3) costs also decrease but by less than the reduction in sales because there is a need to invest more in storage systems; (4) purchased power and operating costs are essentially the same under both scenarios; (5) the total utility revenue requirement remains basically unchanged; (6) lower retail sales under Scenario 3 with essentially the same costs as Scenario 1 translate into higher retail rates for consumers without access to a distributed solar PV system.

To be clear, CNE is not advocating for Scenario 1 over Scenario 3 or any other specific scenario for that matter. Our point is that there are tradeoffs that need to be taken into account by those responsible for managing and planning the electric system. Furthermore, those tradeoffs should be disclosed and clearly explained to the people of Puerto Rico. There are many benefits to having a more resilient system. There are also many costs that need to be incurred to achieve a higher level of resiliency. And those costs would disproportionally fall on those unable (for whatever reason) to install a rooftop solar system. If these facts are disclosed clearly and fairly by decision-makers and the decision is still made to implement Scenario 3, or something close to it, then so be it. But let’s be sure we can pay for it.

Section 3: It’s Expensive

The DOE did not perform an independent analysis of the costs required to bring the electric system “back into a state of good repair, but rather rel[ied] on the FOMB’s 2023 Certified Fiscal Plan for PREPA to identify both the level of investment and the sources of funds to cover that level investment.” (PR100 Final Report, p. 407) According to the DOE analysis, recovery-related investments total $15.441 billion, which includes spending on generation, transmission, and distribution system repairs and replacements, as well as on the Tranche 1 transmission network upgrades.

Notice that the $15.441 billion amount does not include the capital investment necessary to fund new generation as well as the upgrades and extensions of the transmission and distribution (“T&D”) system required to achieve the 100% goal by 2050 (with the exception of the Tranche 1 transmission system upgrade). One independent expert estimated additional T&D capital investments between 2030 and 2035 would add up to an additional $13.6 billion. (London Economics International, Critique of Government Parties’ Assertion that the 9019 Settlement Will Not Affect Non-settling Creditors and Would Avoid a Subsequent Title III Filing by PREPA, October 30, 2019, p. 97, Document #: 1890-1) Keep that in mind as we focus on the resources identified by the DOE to finance the recovery-related investments.

According to the DOE, the following sources of funds are available to cover the $15.441 billion spending on recovery-related investments:

  • $13.723 billion from FEMA
  • $0.500 billion from HUD
  • $0.285 billion dedicated by the Government of Puerto Rico from 2023 to 2025
  • $0.193 billion in insurance proceeds
  • $0.740 billion collected from ratepayers through 2034, financed via headroom in rates from 2020 to 2028, “at which point PREPA is assumed able to access capital markets after its exit from bankruptcy in 2024.” (PR100 Final report, p. 408)


Source: PR100 Final Report, p. 408

As stated above, there is also a need to make additional investments, beyond the recovery-related capital expenditures set forth above, in order to meet the Act 17 RPS requirements:

  • Transmission System Expansion: The interconnection of new renewable resources will require the construction of new tie lines to the bulk power system in Puerto Rico. The DOE assumed different entities would be responsible for covering those costs. First, as stated above, the Tranche 1 transmission network upgrade will be paid for with federal funds. Second, for subsequent tranches “transmission costs were assumed to be financed by third-party renewable development sponsors and thus included in power purchase and operating agreements (PPOAs) until 2028.” Third, commencing in 2028 PREPA “was assumed to be in a position to finance these investments due to its exit from bankruptcy and ability to access capital markets.” (PR100 Final Report, p. 408)
  • Distribution System Upgrades: As new DERs and EVs are deployed it will become necessary to upgrade parts of the distribution system. The DOE estimates there will be excess capacity and energy that cannot be integrated into the distribution system starting in 2037. For each scenario, the DOE assumed that these integration challenges would be mitigated by increasing the amount of bulk storage (batteries) on an incremental basis as renewable capacity expanded. This incremental storage was assumed to be procured via PPOAs. (PR100 Final Report, p. 409)
  • New Generation: Utility-scale generation as well as bulk storage resources are expected to be procured via PPOAs. (PR100 Final Report, p. 416) With respect to rooftop systems, the DOE, as stated above, “did not assume how those systems would be paid for or whether any public or federal funds would be allocated to pay for them.” (PR100 Final Report, p. 185)

In addition to the costs outlined above, operating the electric system requires paying for other costs such as fuel costs, legacy debt charges, Paygo pension payments, LUMA contract fees and fixed operation and maintenance (“O&M”) costs, Genera contract fees and legacy generation fixed O&M costs, PREPA Holdco fees, CILT and subsidies, and energy efficiency programs, among others.

PREPA, just like most utilities, recovers some costs via basic tariff charges, which are set during general rate cases, and other costs via rate riders that are updated on a more frequent basis. According to the DOE, “basic tariff charges differ by customer class while rate riders can be, and often are, universally applied to all customer classes.” (PR100 Final Report, p. 422)

The DOE assumed the following division between basic tariff charges and rate riders to estimate the utility revenue requirements going forward:


Source: PR100 Final Report, p. 423

We assume that the final allocation will be determined by the PREB but we notice that significant changes to PREPA’s current billing practices may be necessary to reconcile tradeoffs between solvency and equity objectives going forward.

Let’s take one issue that has been in the news recently to analyze some of the equity concerns that may arise going forward. Customers who currently participate in the Net Energy Metering program are compensated for their net energy exports to the grid at the same amount (per kWh) they are charged for their imports from the grid. This may result in an overpayment to those customers because, while it is true that every kWh exported by a NEM customer reduces PREPA’s variable costs (that is, PREPA avoids incurring these costs), there are some fixed costs that the utility has to incur to interconnect NEM customers to the grid. So, while fuel and purchased power costs (from AES and EcoElectrica) may be avoided, other costs such as debt service, pension payments, and the LUMA fees and fixed costs, for example, have to be paid regardless of how much electricity NEM customers export to the grid.

Therefore, net metering customers should be compensated at a rate per kWh equal to (x) the utility’s avoided costs (as defined by the PREB) minus (y) the utility’s fixed costs (as defined by the PREB). Some advocates for rooftop solar systems argue that overpaying net metering customers is justified as a matter of public policy because it helps to speed up the adoption of DERs. We don’t have an issue with that policy as long as it is (1) clearly and transparently stated and (2) customers understand that, everything else being equal, it would result in higher rates (even if only marginally) for those customers who do not participate in the net metering program because fixed costs will have to be recovered from a smaller customer base.

The DOE found that the utility revenue requirement, relative to the $3.2 billion collected in 2020, fluctuates across three time periods. First, there is a “rapid and substantial increase” in utility incurred costs in the first five years of the analysis, “ending at a level between $5.0 billion and $5.3 billion.” Then, between 2025 and 2045 the revenue requirement trends downward to between $3.9 billion and $4.7 billion. Finally, substantial costs have to be incurred to meet the 2050 objective, increasing the revenue requirement to between $4.3 billion and $5.4 billion. (PR100 Final report, p. 425)

The fluctuation in the utility revenue requirement, in turn, results in variations in the estimated all-in average retail rates over the next 25 or so years. According to the DOE:

  • Between 2020 and 2025, all-in average retail rates increased between roughly 65% to 80% from their starting level of 19.9 cents per kWh;
  • Then, between 2025 and 2045 rates either decreased by up to 0.4% per year or increased by as much as 1.5% per year, depending on the scenario; and
  • After 2045, rates increase again rising between 11% and 17% by 2050, again depending on the scenario. (PR100 Final report, p. 429)

The large increase in rates over the first five years of the transition is driven largely by the rapid short-term build-out of utility-scale generation. This build-out is driven, in turn, by two factors: (1) “meeting industry accepted [resource adequacy] performance; and (2) meeting the 40% RPS by 2025.” (PR100 Final report, p. 230) In order to assess the relative contribution of each of these factors to the 2025 build-out, the DOE ran a scenario variation that relaxed the 40% RPS requirement under the 1LS Scenario. They found that “this relaxation significantly changed the technologies and total capacity selected in the build-out relative to the 1LS results; however, the relaxed RPS total capital and operating costs results were within 1% of the 1LS results. This similar cost result suggests that the dramatic build-out of utility-scale generation is driven principally by the requirement to achieve system reliability rather than the requirement to meet the 40% RPS.” (PR100 Final report, p. 230)

In other words, the initial large increase in rates, estimated to be between 65% and 80% relative to 2020 rates, is to a large extent the legacy cost we all have to pay for the decades of corruption, mismanagement, negligent administration, political shenanigans, and postponed maintenance and capital expenditures at the old PREPA. Those who are prone to romanticize the old PREPA are well advised to keep this in mind before they wax poetic about the “good old days”.

Section 4: Is it Good for the Economy?

The DOE estimated the net economic impact of the transition by analyzing two sets of countervailing effects or impact channels on the economy. The first channel considers the stimulative or positive effects associated with higher construction (CapEx) investments and ongoing O&M expenditures for both (1) utility-scale generation, transmission, and distribution and (2) the increased adoption of distributed PV and storage. (PR100 Final Report, p. 486) These investments have positive impacts on employment, earnings, output, and total value added.

According to the DOE, construction and installation activities, which are temporary, create more than six times the number of jobs and earn more than the operation and maintenance efforts, on average. “However, O&M efforts create longer-lasting jobs with higher associated labor hours than temporary construction efforts.” (PR100 Final Report, p. 402) In addition, construction/installation jobs are subject to a “dramatic boom/bust cycle,” increasing rapidly at first to meet the 40% RPS requirement by 2025 and later the 100% RPS requirement by 2050. In contrast, there is more stability in O&M jobs as renewable energy assets are deployed over time. Finally, utility-scale solar supports 44% of all O&M jobs, on average, followed by residential solar with 31% of O&M jobs. (PR100 Final Report, p. 475) Notice the tradeoffs associated with each of the solar PV generation options.

The figure below shows the aggregate amounts of expected CapEx and O&M expenditures, adjusted for inflation, between 2025 and 2050:


Source: PR100 Final Report, p. 493

However, as we stated previously, the transition will be expensive and both households and businesses will face higher electricity prices. The second channel considers the contractionary or negative effects of higher electricity prices. In general, there are two important macroeconomic effects associated with higher electricity prices.

  • First, higher prices mean electricity expenditures increase as a share of total spending, reducing the consumption of other goods and services and, thus, overall economic activity decreases.
  • Second, as businesses face higher production costs, due to higher electricity prices, they increase the price of their products. Higher inflation leads to lower levels of consumption, production, and employment. Both effects reduce real household income. (PR100 Final Report, p. 486)

The figure below shows the projected average inflation-adjusted electricity rates between 2020 and 2050:


Source: PR100 Final Report, p. 495

Looking at both figures together we discern the following pattern:

  • A sharp increase in both capital spending and utility rates during the period between 2020 and 2025.
  • During the period between 2025 and 2045, there is less new capital spending relative to period 1, while the adoption of distributed PV increases. Real rates relative to 2025 stay flat or fall for most scenarios during this period, with the notable exception of Scenario 3MM.
  • Finally, during the last period between 2045 and 2050, there is another sharp increase in capital expenditures, accompanied by an increase in real rates under all scenarios.

The DOE then proceeded to “disentangle” the simultaneous positive effects due to higher spending from the negative effects of price increases. The figure below shows the dis-aggregated employment effects of the expenditure and price impacts for Scenarios 1LM and 3LS:


Source: PR100 Final Report, p. 497

Under Scenario 1LM in 2025, the investment needed to meet the 40% goal of Act 17 results in more than 16,000 new jobs (blue column). This positive impact, however, is more than offset by the negative effects of higher electricity prices, which induce a loss of 25,000 jobs. The same pattern is observed under Scenario 3LS in 2025.

By 2028, “the expenditure and price impacts are much smaller in magnitude than in Epoch 1. This is because there is relatively little new CapEx in this time frame, and electricity price changes are quite small relative to 2025.” (PR100 Final Report, p. 497)

The story is similar when analyzing the impact on household income. As shown in the figure below, economic activity and employment growth related to new expenditures lead to an increase in household income in 2025 under both Scenarios 1LM and 3LS. However, higher electricity prices over this period lead to a decline in real household income that more than offsets any income gains due to the increase in employment.


Source: PR100 Final Report, p. 498

In sum, according to the DOE model, “for 2025, although some households do benefit from the new jobs created by the CapEx and O&M expenditures, most households in Puerto Rico do not see much benefit; instead, they are adversely affected by the higher electricity prices in the early years.” (PR100 Final Report, p. 498) The DOE notes, though, that “while these adverse effects are substantial, it is important to remember that the 2025 scenario reflects a vastly improved electric system, with more reliability, capacity, and resiliency.” Once again, tradeoffs are unavoidable in this process.

Looking at the whole term of the transition, the economic impact, both on employment and household income, is expected to turn slightly to moderately positive, with some fluctuation depending on the scenario. In terms of the impact on employment, the figure below shows the employment impact for six scenarios out to 2050:


Source: PR100 Final Report, p. 499

  • During the first period up to 2025, there is a net decline in employment across all six scenarios, with the largest losses in 3LS (minus 15,894), reflecting the scenarios relatively high price increase and slightly lower CapEx expenditures. The smallest losses are in Scenario 1LM (minus 9,178). (PR100 Final Report, Appendix J, p. 743 and p. 728)
  • During the second period (2025-2045) employment “impacts are relatively small relative to 2025, reflecting low levels of new spending and small price changes”. (PR100 Final Report, p. 499) The employment impacts are positive across the entire second period for Scenarios 1LS, 1LM, 1MS, and 2LS. Beginning in 2035, “employment impacts for the scenarios with higher levels of distributed PV adoption (3LS and 3MM) turn slightly negative, reflecting relatively larger electricity price increases.” (PR100 Final Report, p. 500)
  • During the final period, between 2045 and 2050, there are significant positive employment impacts. “This reflects higher expenditures as the final investments are made to meet the 100% renewable goals.” In this period, electricity prices also increase, but by a smaller percentage than in Period 1, which means their effects are less detrimental. (PR100 Final Report, p. 500)

The forecast in terms of the impact on household income is fairly similar, as shown in the figure below:


Source: PR100 Final Report, p. 501

  • During the first period, all six scenarios reflect losses of real household income. The losses range from $580 million in Scenario 1LM to $864 million in Scenario 3LS. (PR100 Final Report, Appendix J, p. 728 and p. 743) In all six scenarios, the adverse impacts of simultaneous electricity price increases more than offset the gains in employment due to the additional CapEx.
  • After 2025 and up to 2045, Scenarios 1LS, 1LM, 1MS, and 2LS show relatively small increases in household income while Scenarios 3LS and 3MM show modest decreases between 2035 and 2045. In general, during this period there are much smaller net effects on real household income, as electricity price changes and CapEx are both much lower than in the first period.
  • During the third period, there are positive impacts on real household income across all six scenarios. “Like employment, these increases are largely due to the stimulative impacts of relatively high aggregate expenditures…which are partially, but not fully offset by the real electricity price increases in that time frame…Across the six scenarios, the average increase in real household income is $764 million.” (PR100 Final Report, p. 500.) During this period Scenario 3LS shows the highest increase in household income by 2050, $1.25 billion or 4.74% relative to 2025, while Scenario 3MM shows the lowest increase with $564 million or 2.14% also relative to 2025. (PR100 Final Report, Appendix J, p. 743 and p. 748)
  • In general, “increasing levels of distributed PV plus storage adoption were slightly more harmful to the economy relative to a higher reliance on utility-scale renewable energy resources.” (PR100 Final Report, p. 476)

In sum, the economic impact of the transition to 100% renewable generation, as modeled by the DOE, exhibits several tradeoffs that policymakers will need to take into account: (1) between construction and maintenance jobs; (2) among and between the costs and benefits of the different technologies; and (3) between short-term losses and long-term benefits in terms of employment and household income.

Section 5: Risks and Uncertainties

Any process as complicated as the transition to 100% renewable generation will be full of risks and uncertainties. In this section, we highlight some of the most significant in our opinion.

  • The Challenge of Stabilizing the System – Puerto Rico’s electric system is functional but fragile. At any given moment more than half of the PREPA’s legacy generation units could be offline either due to unscheduled repairs or because they are subject to time use limitations due to the failure to comply with environmental rules and regulations. On the transmission and distribution side, the PR100 Study has highlighted a significant problem with the lower-voltage (38-kV) transmission network as well as voltage control and backfeeding problems in the distribution system. These issues, by themselves, would present a formidable challenge to any utility to manage. When combined with the transition to full renewable generation the whole system is at risk of becoming unstable. Potentially catastrophic scenarios cannot be fully ruled out if things are not done the right way. Stabilizing the electric system in the short term is of paramount importance and should be the number one priority of policymakers right now.
  • Coordination Problems – Coordination among and between (1) federal agencies; (2) federal and Puerto Rico agencies; and (3) Puerto Rico state agencies and municipalities has been problematic ever since the recovery and reconstruction process started. To be fair, some of the initial coordination problems were the product of unreasonable terms and conditions imposed by the Trump administration to intentionally slow down the disbursement of funds to Puerto Rico. And certainly, administrative processes have improved over the last six or so years. Yet coordination problems still remain and have plagued policymaking regarding the reconstruction of the system, the procurement of utility-scale renewable generation, and the timeline for decommissioning fossil fuel legacy assets. In our view, the PREB should be the agency taking the lead in coordinating the actions of the multiple stakeholders in this process as well as the forum for resolving knotty policy and technical issues.
  • Cost/Resiliency/Reliability Tradeoffs – It is clear from the PR100 Final Report that there is a tradeoff between systemic resiliency and costs, both in terms of the rates paid by customers that remain dependent on the grid and in macroeconomic terms. Customer rates and negative short-term macroeconomic effects (in terms of lower employment and household income) tend to be higher under all variations of Scenario 3. In addition, system reliability could be compromised to the extent that excess PV capacity and energy cannot be integrated into the distribution system starting as soon as 2037. If the decision is made to prioritize and put a premium on resiliency rather than on lower costs, then that decision should be made and explained to customers as transparently and clearly as possible so they can plan accordingly.
  • Compensation for Net Energy Metering – Participants in the net metering program currently receive a full kilowatt-hour credit on their energy bills for every kilowatt hour they export to PREPA. This means that those customers do not pay the fixed costs of maintaining the electric grid. Therefore, PREPA’s operational and maintenance costs are disproportionately borne by customers unwilling or unable to participate in the net metering program. Act 17 required the PREB to undertake a study of the net metering program by April 2024 to determine whether the current system is adequately structured. However, that study has not been done. Unfortunately, this has become a political issue as the Puerto Rico legislative assembly has enacted another law that orders the PREB to postpone any such study until 2030 and the FOMB has taken the position that this constitutes an undue interference with the work of the PREB. Leaving political turf battles aside, we believe the NEM study should be executed as soon as possible and its findings should be made public and widely divulged. Again, if the policy decision is made to overcompensate participants in the net metering program to incentivize the installation of rooftop solar systems, then that decision should be explained clearly to all electric customers, including the disclosure that, everything else being equal, it would result in higher bills (even if only marginally) for customers that do not participate in the program.
  • Policy and Regulatory Constraints Regarding the Contribution of Distributed PV to Achieve the RPS Goals – The DOE configured its model to count generation from distributed PV toward the achievement of renewable generation goals. However, “the utility and operator do not yet have policies, metering, or an accounting method in place to do so. Further guidance and regulations on renewable energy certificates will clarify the contribution of distributed renewable generation toward the RPS.” (PR100 Final Report, p. 214) Additional policy guidance is also required to determine the amount of rooftop solar capacity and utility-scale PV generation that will be deployed to meet the statutory RPS requirements. The disagreement between the proponents of each option has caused undue delays in the deployment of renewable generation and only benefitted fossil fuel suppliers.
  • Reaching 40% RPS by 2025 Appears Unfeasible – According to the DOE analysis, “deployment of renewables at a rate to achieve the 40% RPS goal would require a rapid rate of procurement of over 100 MW per month through 2025 from a level of minimal utility-scale build-out in recent years. This rate of deployment would be challenging to achieve.” (PR100 Final Report, p. 229) While we appreciate the gracious and diplomatic drafting of the authors of the PR100 Final Report, the reality is that PREPA, LUMA, and Genera don’t have in place the operating framework to support this rapid build-out; the T&D system needs to be upgraded before this amount of capacity and energy can be integrated into the grid; and procurement has been slow due to policy disagreements and coordination problems. Therefore, the most likely scenario is that Puerto Rico will miss the 40% goal by 2025. Given that scenario, Puerto Rico will be better off extending the intermediate goals to reach 100% renewable generation by 2050 and doing things right rather than carelessly and unthinkingly rushing to meet the 40% goal.
  • Obtaining Funding for the Grid Upgrade Remains Challenging – The DOE estimates that recovery-related investments total $15.441 billion, including generation, transmission and distribution system repairs and replacements, as well as Tranche 1 transmission network upgrades. As we stated above, at least one independent expert estimated additional T&D capital investments between 2030 and 2035 would add up to an additional $13.6 billion. Even if we cut that estimate by half, given that it was made by a consultant hired for litigation purposes, obtaining $6.8 billion in additional financing will not be an easy task. According to the DOE, “capital costs for energy projects in Puerto Rico were significantly higher than they were in the 50 U.S. states. Local factors that lead to elevated costs include transportation of component parts and materials, persistent industry-wide supply chain issues from the COVID-19 pandemic, inflation, and international conflict.” (PR100 Final Report, p. 72) Furthermore, Puerto Rico regulatory requirements may affect the final cost of any given project. While some of these issues may eventually resolve themselves, currently a high level of uncertainty regarding the financing of capital expenditures remains.
  • PREPA’s Access to Capital Markets – Right now PREPA does not have access to the capital markets as it is still undergoing a bankruptcy process. Given that situation, the DOE assumes PREPA will exit bankruptcy in 2024 and will have access to the capital markets by 2028 and, thus, the ability to finance upgrades to the transmission and distribution system going forward from 2028. In our view, this assumption could be overly optimistic for several reasons. First, it is by no means clear that PREPA will exit bankruptcy in 2024. Even if a POA is certified by the Federal Court this year, several creditors have already indicated they will appeal such certification, potentially adding several years of litigation to this process. Second, a restructured PREPA will be limited in its ability to issue new debt until the bonds issued as part of the current restructuring are paid in full. We don’t know yet what legal and financial conditions PREPA will have to satisfy (in the form of financial covenants limiting new debt issuance and legal subordination requirements) in order to issue new debt after 2028. Finally, any announcement regarding the issuance of new debt by PREPA will probably face significant backlash from customers and other stakeholders who remember waste and mismanagement at the old PREPA.
  • Uncertainty Regarding Energy Efficiency Measures and EVs – There is significant uncertainty regarding the implementation of energy efficiency measures and the adoption of electric vehicles in Puerto Rico. These two factors impact load forecasts in opposite directions: increased energy efficiency reduces demand for electricity while relatively high adoption of EVs increases demand for electricity. In our view, the most likely scenario right now is that Puerto Rico will not meet its energy efficiency objective because it is not making the necessary investments to achieve it, while the adoption of EVs is likely to be at a lower rate than in the U.S. due to Puerto Rico’s lower wages and income.
  • Risk of Grid Defection/Death Spiral – Under several of the scenarios modeled by the DOE, the volume of electricity sales declines faster than the total cost required to serve customers. This means that the rate per kWh increases and adds to the financial burden of existing customers, leading to even more “grid defection” (mostly higher income individuals and industrial/commercial clients), which means the remaining costs of service are spread over an even smaller customer base, leading to even higher electricity rates, and so on. This cycle is called a “utility death spiral” and while a complete utility death spiral has yet to be experienced in the U.S. electricity sector, in the case of Puerto Rico this risk cannot be ruled out. The DOE vaguely hinted as much when it stated that “PR100 analyzed a highly centralized utility in a future that was increasingly comprised of distributed and decentralized electricity resources which were neither owned nor controlled by the utility. Our analysis illustrates the implications of this seemingly dichotomous future: utility costs could not be reduced as quickly as retail sales resulting in higher retail rates.” (PR100 Final Report, p. 446)

Conclusion

Five years ago, Puerto Rico enacted legislation setting the ambitious goal of generating 100% of its electricity from renewable sources by 2050 even as it rebuilt its electric grid, which was devastated by Hurricane María in 2017. This is a clear and compelling objective that is worth pursuing. Yet success is not guaranteed because it is also incredibly complicated. The policy questions require analyzing theoretical, technical, and economic constraints as well as making difficult tradeoffs among and between complex economic, technical, and social objectives. In addition, the technology is still evolving. In that sense, there is a tension between the technology that is already available now and the technology that is not yet viable or commercially available.

We also need to note that the transition to 100% renewable generation has a political economy dimension, as the old technology (and those who benefitted from it) is replaced by a still evolving new one (and those who stand to gain from it). Humanity’s natural resistance to change is thus reinforced by powerful economic and financial incentives. 

Furthermore, during the last five years, Puerto Rico has fallen behind schedule to meet the interim objective of 40% renewable generation by 2025 due to bureaucratic and coordination failures. We are, therefore, at a critical juncture. We still have time to rebuild our electric grid and to completely switch away from fossil fuel generation by 2050. But achieving those objectives will require strategic thinking, skilled policymaking, competent execution, tactical dexterity, the ability to act collectively over the long term, and inspired leadership—resources that have been in short supply in Puerto Rico for at least a generation. Make no mistake, this endeavor will be challenging, hard, and expensive. There will be setbacks along the way. But it is the right thing for Puerto Rico to do for the generations yet to be born. So, we better get working if we are going to make it.

Let’s get going.

CNE Review – March 2024

Published on March 14, 2024 / Leer en español

See all editions of the
CNE Review
SHARE

In This Issue

CNE’s Policy Director analyzed the recently published summary of the Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (“PR100” or the “Study”). Click here to read the full analysis.

While the PR100 Final Report will not be released until late March, in this issue of the CNE Review we highlight some of the findings of the summary due to their importance and their potential policy implications for Puerto Rico’s electricity sector.

In the full analysis, we outline the U.S. Department of Energy’s (“DOE”) scenarios, based on different assumptions, that would enable Puerto Rico to achieve the goal of  100% renewable generation by 2050. While this study provides valuable guidance, difficult decisions will have to be made by Puerto Rico’s government that imply important tradeoffs between affordability, time, and resources.

CNE advocated strongly for Act 17 of 2019 and we believe in the goals set by this law. Puerto Rico needs an electricity system based on renewable energy that is both reliable and affordable. But as the country moves toward this transition, we need to make sure that we don’t lose sight of the well-being of both families and businesses. Our next steps will include analyzing the DOE’s full report which will be made public at the end of March. CNE will continue to monitor, analyze, make recommendations, and advocate for an affordable and sustainable electricity system for Puerto Rico.

Insights + Analysis from CNE

Analysis of the PR100 Summary Report

By Sergio M. Marxuach, Policy Director

Introduction

The Puerto Rico Energy Public Policy Act of 2019 (“Act 17 of 2019”) requires that Puerto Rico meet 100% of its electricity needs with renewable energy by 2050. To reach that objective, Act 17 set the following interim goals:

On February 7, representatives of the DOE, including Secretary Granholm, presented a summary of the findings of the PR100 Study. This Study was the product of a two-year effort led by the DOE, with the collaboration of the University of Puerto Rico Mayaguez and other local stakeholders, to analyze and identify possible pathways for Puerto Rico to achieve its goal of generating 100% of its electricity from renewable energy sources by 2050.

While public discussion has focused on a few of the Study’s main findings indicating that Act 17’s requirement can be met by 2050, we want to highlight the different scenarios presented in the summary, the tradeoffs required, and their potential policy implications.

In this process, it is also crucial for local decision-makers to take into consideration the following unanswered questions and inform all stakeholders on how they will be addressed: 

  • How much will it cost to achieve maximum resilience in Puerto Rico? 
  • How much can consumers afford or are willing to pay to transition to renewables?
  • Which agency or entity will decide on the scenario, if any, to be implemented in Puerto Rico?
  • What is the economic impact of each scenario, with their variants, on GNP, GNP growth, consumption, employment, and income?
  • If the cost of maximizing resilience is too high, who decides which geographic areas will be excluded?
  • What is the total investment required by system segment (transmission, distribution, generation, battery storage, access, and connectivity infrastructure) to achieve the 100% renewable energy objective? How will that investment be financed (again broken down by segment)?
  • How much funding has been identified, committed, and spent for each of the segments?

Scenarios, Tradeoffs & Policy Implications

Scenarios

The DOE, together with several of the national labs and local stakeholders, modeled three scenarios to meet the 100% target by 2050. Each scenario assumes the current dilapidated electric grid is sufficiently repaired to support the reliable operation of the electric system before the full deployment of renewable generation.  Then the scenarios are initially differentiated by varying the adoption level of distributed energy resources (“DERs”) such as rooftop solar, utility-scale solar photovoltaics (“PVs”), and wind generation units, among others. Two variations are added for land use (how much land is needed to develop these new projects), and electric load with 2 variants each, resulting in a total of 12 scenario variations.

Source: PR100 Summary, p. 8.

Scenario 1 assumes the adoption of DERs is driven primarily by “economic factors and is based on financial savings and the value of backup power to building owners”. It also prioritizes the deployment of DERs on “critical infrastructure such as hospitals, fire stations, and grocery stores”.  This is called the “Economic” Scenario. 

Scenario 2 extends the adoption of DER beyond the levels specified in Scenario 1 to include “very low-income households (0%-30% of area median income) and those in remote areas who would not have bought systems solely based on economics”. This is called the “Equitable” Scenario.

Scenario 3 models the “maximum deployment of DERs on all suitable rooftops at a level that meets their critical loads” (PR100 Summary, p. 8). This is called the “Maximum” Scenario.

Regardless of the scenario, the DOE states, increased system capacity is needed immediately to maintain its stability. 

Tradeoffs

We found that the Scenarios modeled by the DOE present significant tradeoffs between resilience (Scenarios 2 and 3) and energy affordability (Scenario 1); between land use and energy affordability (“less land” scenarios tend to be more expensive); between meeting the 40% goal by 2025 and achieving acceptable grid reliability in the short term; and between incurring high short-term costs to obtain long-term benefits, depending on the scenario to be implemented.

The existence of these tradeoffs raises the question of which agency or entity should be in charge of making these decisions. We strongly recommend that the Puerto Rico Energy Bureau (“PREB”) be in charge of making these decisions.

Policy Implications
         To Achieve the 2025 Interim Goal:

By mid-2023, notwithstanding a significant increase in distributed solar PV generation, only between 3% and 5% of the generation capacity available for the grid came from renewable sources.

This means that Puerto Rico is significantly behind schedule to meet the interim target of 40% renewable generation by 2025. Puerto Rico will likely miss it.

Furthermore, according to the DOE, the all-in average retail rate would increase between 66% and 83% between 2020 and 2025, depending on which scenario is implemented.

A rate increase of this magnitude would have severe, material adverse effects on the economy of Puerto Rico in the short term and is simply not economically feasible. It will be necessary to mitigate these negative effects, either through subsidies, an extension of the timeline for achieving the transition, or through other policies.

         Achieving the 2050 Goal

According to the Study, it is feasible to achieve the objective of 100% renewable energy generation in Puerto Rico by 2050 without using agricultural lands for developing utility-scale generation. However, the economic cost of the transition to 100% renewable energy by 2050 is quite significant, regardless of the scenario.

In addition, there appears to be a contradiction in the Study since it states that the 100% objective can be met using “mature” technologies such as utility-scale PV, distributed PV, and land-based wind. Yet, later on in the report, it states that the optimal resource mix to meet the 100% objective includes generation from engines using biodiesel fuel. To our knowledge such technology is not yet mature or commercially viable for the generation of electric power.

The PR100 Study forecasts loads out to 2050 and models capacity expansion to find the lowest-cost system for each scenario while meeting load requirements. In general, the scenarios outlined in the report with higher deployment of DERs using less land tend to be, on average, more expensive than other scenarios. They also result in higher rates for the consumer and induce greater short-term adverse effects on the Puerto Rican economy. How will these adverse effects be minimized if one of these scenarios is chosen?

         The Challenge of Forecasting Demand

Forecasting long-term energy demand trends is one of the most complex issues in this planning exercise. The time horizon is too long, there are too many variables as well as multiple unknown unknowns (for example, the risk of a major hurricane striking the island ten years from now). Therefore, no one knows what the demand for electricity will be in Puerto Rico twenty-five years from now. It is still necessary, however, to take into account potential risks and uncertainties and start the transition to achieve the 100% goal by 2050. This issue is also important in the court-led process to restructure the debt of the Puerto Rico Electric Power Authority (“PREPA”) that is currently ongoing in federal court.

Given this significant uncertainty, we recommend that representatives of the DOE, the Fiscal Oversight and Management Board, Genera, LUMA, PREPA, and the PREB meet and seek agreement on a single set of forecasts out to 2050 and that the same projections be used for both the development of PREPA’s new IRP and in PREPA’s financial Plan of Adjustment that will be eventually certified by the federal court. Using one set of load forecasts for operational planning purposes (the IRP) and another for financial planning purposes (the Plan of Adjustment) does not make sense.

More Information is Needed

The PR100 Summary appears to present a good preview of the findings of the PR100 Study. From the Summary it seems that the PR100 Study is a thorough and thoughtful analysis carried out by a respected group of stakeholders. It is a welcome contribution to the public debate and a valuable resource for those who analyze and study Puerto Rico’s electricity system. We hope that the final report provides more details on the following critical areas:  

  • Load Forecasts: We need more information about the methodology used by the DOE to forecast electricity demand over the long term to reach any conclusion regarding the reasonableness of its estimates. Specifically, we need to know whether the DOE estimated demand functions for commercial, industrial, and residential users; the price elasticities used and how they were calculated; and additional information regarding their energy efficiency estimates.
  • Biodiesel Fuels: We are not familiar with this technology and need more information before reaching any conclusions regarding the feasibility of its future use in Puerto Rico for the generation of electric power.
  • Economic Impact Analysis: We need more information regarding the economic impact of rate increases in the short term on GNP level, GNP growth, employment, income, and consumption expenditures to assess the economic feasibility of the different scenarios.
  • Total Capital Expenditures and Sources of Financing: It would be useful if the final PR100 Study included a breakdown, by scenario and system segment (transmission, distribution, generation, energy storage, access infrastructure, etc.), of (1) all the capital expenditures required to achieve the 100% goal by 2050 and (2) potential financing sources for each of these expenditures.

On Our Radar…

Reconstruction Spending – A recent report from the United States Government Accountability Office (“GAO”) found that “the Federal Emergency Management Agency (FEMA) had awarded about $23.4 billion in Public Assistance to Puerto Rico’s permanent recovery work related to hurricanes Irma and Maria and the 2019 and 2020 earthquakes, as of June 2023. Of that, Puerto Rico has expended about $1.8 billion and a substantial amount of permanent work remains. Further, about $11.3 billion of the awarded funds needs FEMA’s authorization before Puerto Rico can expend it.” In other words, we have made some progress but a lot of work remains to be done.

An Analysis of PR100 Summary Report

Analysis of PR100 Summary Report

Published on March 13, 2024 / Leer en español

Sergio portrait
Policy Director
DOWNLOAD
SHARE

Introduction

On February 7, representatives of the U.S. Department of Energy (“DOE”), including Secretary Granholm, presented a summary of the findings of the PR100 Study. This was a two-year effort led by the DOE, with the collaboration of the University of Puerto Rico Mayaguez and other local stakeholders, to analyze and identify possible pathways for Puerto Rico to achieve its goal of generating 100% of its electricity from renewable energy sources by 2050.

While the PR100 Final Report will not be released until late March, in this policy brief we highlight some of the findings of the PR100 Summary due to their importance and their potential policy implications for Puerto Rico’s electricity sector.

The Objective

The Puerto Rico Energy Public Policy Act of 2019 (“Act 17 of 2019”) requires that Puerto Rico meet 100% of its electricity needs with renewable energy by 2050. In order to reach that objective, Act 17 set the interim goals of 40% renewable generation by 2025; 60% renewable generation by 2040; the phaseout of coal-fired generation by 2028; and a 30% increase in energy efficiency by 2040. By mid-2023, notwithstanding a significant increase in distributed solar PV generation (as opposed to utility-scale solar), only between 3% and 5% of the generation capacity available for the grid was from renewable sources. Furthermore, “achieving the 40% target by 2025 would represent an increase of at least 3 GW of additional renewable energy capacity if met with utility-scale solar” (PR100 Summary, p.1).

In plain English, this means that Puerto Rico is significantly behind schedule to meet the interim target of 40% renewable generation by 2025 and it is highly likely that Puerto Rico will miss it.

The Scenarios and their Variations

The DOE, together with several of the national labs and local stakeholders, defined three scenarios to meet the 100% target by 2050. All three scenarios assume that “the transmission and distribution networks were repaired sufficiently to support reliable operation of the electric system, and that these repairs were completed with federal funding” (PR100 Summary, p. 4). The scenarios are initially differentiated by varying the adoption level of distributed energy resources (“DERs”).

Scenario 1 assumes the adoption of DERs is driven primarily by “economic factors and is based on financial savings and the value of backup power to building owners”. It also prioritizes the deployment of DERs on “critical infrastructure such as hospitals, fire stations, and grocery stores” (PR100 Summary, p.7-8). This is called the “Economic” Scenario throughout the PR100 Study.

Scenario 2 extends the adoption of DER beyond the levels specified in Scenario 1 to include “very low-income households (0%-30% of area median income) and those in remote areas who would not have bought systems solely based on economics” (PR100 Summary, p. 8). This is called the “Equitable” Scenario.

Scenario 3 models the “maximum deployment of DERs on all suitable rooftops [our emphasis] at a level that meets their critical loads” (PR100 Summary, p. 8). This is called the “Maximum” Scenario.

The graphic below shows the three scenarios modeled in the PR100 Study, “distinguished by varying levels of DER adoption. Differences between scenarios are circled in blue.”


Source: PR100 Summary, p. 8.

In addition, the authors also defined two variations regarding (1) land use and (2) electric load (demand) projections to 2050, to apply to each of the three scenarios.

The land use variation, in turn, has two variants: (1) Less Land and (2) More Land. The purpose of modeling this variation was to determine whether the 100% target by 2050 can be “met by developing utility-scale projects only on land not designated for agricultural purposes” or whether the use of agricultural lands would be required (PR100 Summary, p. 9).

In both land use variants, “development of utility-scale solar PV and wind is restricted from areas such as roadways, water bodies, protected habitats, flood risk areas, slopes greater than 10%, and agricultural reserves. In the Less Land variant, development of utility-scale projects is also restricted from areas identified for agricultural use in the 2015 Land Use Plan” (PR100 Summary, p. 9).

This analysis concludes that in the “More Land variant…638 km2 [246.3 square miles] are available for solar development, with technical potential of 44.66 GW” while in the “Less Land [variant] the developable area is 203 km2 [78.4 square miles] with technical potential of 14.22 GW” (PR100 Summary, p. 9).

The electric load variation also has two variants: (1) the Mid case and (2) the Stress case. Each case projects electric load out to 2050 taking into account (1) end-use demand variation due to changes in population, manufacturing employment, economic activity, and other variables; (2) increased demand from the adoption of electric vehicles (“EVs”); and (3) decreasing demand from the implementation of energy efficiency (“EE”) measures.

The Stress case variant was expressly modeled to “help decision makers not to under plan in the event the load does in fact increase and to account for uncertainty in the inputs to the end-use load calculation” (PR100 Summary, pp. 9-10). The development of this variant leads us to think that the DOE believes decision-makers in Puerto Rico could be underestimating the long-term demand for electricity on the island.

The Mid case variant shows “slightly decreased end-use electricity sales over time, primarily due to forecasted long-term declines in population and real gross national product” (PR100 Summary, p. 10). On the other side of the spectrum, the Stress variant “assumes the combination of end-use loads and energy efficiency will result in flat annual electricity sales and electric loads from FY23 to FY51” (PR100 Summary, p. 10). When the adoption of EVs is added in, the electricity load increases moderately over time out to FY51.

In sum, the PR100 team modeled three scenarios with two variations each with two variants, resulting in a total of 12 scenario variations. The scenarios are identified first by number and then by variation. For example, scenario 1LS means Scenario 1 (Economic), Less Land, Stress load. According to the PR100 Summary, there appears to be fairly small variation in the results among and between the scenarios during the next few years.

The key findings here are: (1) the DOE is assuming federal funding in the immediate to near term will be used to finance the repair of the transmission and distribution networks to support the reliable operation of the electric system before the deployment of DERs begins in earnest; (2) decisionmakers in Puerto Rico could be underestimating long-term electricity loads; and (3) “regardless of scenario or source of renewable energy, increased capacity is needed on the system immediately to achieve a robust electricity system for Puerto Rico” (PR100 Summary, p. 10).

Resource Assessment

The DOE executed assessments of the renewable energy sources in Puerto Rico to determine whether the potential of “solar, wind, hydro, and other sources is sufficient to meet Puerto Rico’s goal of 100% renewable energy” (PR100 Summary p. 11). The main findings were (1) that Puerto Rico’s renewable energy potential exceeds the projected loads out to 2050 by a factor of 10; (2) the 100% objective can be met using “mature” technologies such as utility-scale PV, distributed PV, and land-based wind; and (3) “utility-scale solar PV potential capacity on non-agricultural land is sufficient to meet total annual electric load to 2050.” (PR100 Summary, p. 14).

However, the DOE also found that the costs associated with DER deployment under the Less Land variation are higher than the More Land variation, “across all modeled years and technology scenarios” (PR100 Summary, p. 12). This is due to (1) reduced economies of scale; and (2) the increased need for infrastructure (access roads, interconnections, etc.) under the Less Land variation, which would result in a greater number of smaller solar PV and land-based wind plants to be installed—more dispersed across Puerto Rico—when compared with the More Land variation.

In sum, the DOE found that the levelized cost of electricity (“LCOE”) on average would be $79/MWh under the Less Land variant and $75/MWh under the More Land variant. A difference of $4/MWh, or 5.33%, which over some 25-odd years is quite significant.

From a policy perspective, the main finding here is that there appears to be a tradeoff between land use and energy affordability. That tradeoff, in turn, raises the question of which agency or entity should be in charge of deciding to choose one variant over the other.

Electric Load Forecasts

Forecasting long-term energy demand trends is one of the most complex issues in this planning exercise. The time horizon is too long, there are too many variables as well as multiple unknown unknowns (for example, the risk of a major hurricane striking the island ten years from now). Therefore, no one really knows what the demand for electricity will be in Puerto Rico twenty-five years from now. It is still necessary, however, to go through the exercise taking into account potential risks and uncertainties, in order to start the transition to achieve the 100% goal by 2050. This issue is also important in the court-led process to restructure the debt of the Puerto Rico Electric Power Authority (“PREPA”) that is currently ongoing in federal court.

Given the importance of these forecasts, we will take a deeper look into the analysis and projections set forth in the PR100 Summary. As we mentioned above, the DOE executed its load analysis by analyzing three factors: (1) modeling various end-use parameters; (2) modeling the trajectory to achieve the statutorily mandated goal of a 30% increase in energy efficiency by 2040; and (3) projecting the adoption of EVs in Puerto Rico.

With respect to end-use parameters, the DOE took into account “future population size, changes to manufacturing employment, gross domestic product, and climate”. Specifically, they analyzed “existing hourly end-use loads to determine if in the future these profiles would increase or decrease from year to year” (PR100 Summary, p. 15). As noted above, the DOE found that end-use loads are anticipated to decrease across Puerto Rico by 2050 in the Mid case trajectory, based primarily on population and economic forecasts.

In terms of energy efficiency, the DOE carried out two modeling exercises, using different methodologies, to ascertain the feasibility of achieving a 30% increase in energy efficiency (which everything else being equal would result in a reduction in loads) by 2040. Their main finding in this area was that “achieving the 30% goal is ambitious as compared with the bottom-up analysis results which show an 18% increase [in energy efficiency] by 2050” (PR100 Summary, p. 15).

The DOE also projected the adoption of electric vehicles (light as well as medium and heavy-duty) and their contribution to electric load. The key finding here is that the DOE estimates that 25% of light-duty vehicles and 48% of medium- and heavy-duty will be electric by 2050 (PR100 Summary, p. 15).

Finally, the DOE modeled a Stress load forecast “which assumes the combination of end-use loads and energy efficiency will result in flat annual electricity sales and, due to the addition of EV loads, load trajectory increases” (PR100 Summary p. 15).

According to LUMA, total electricity sales in Puerto Rico were 16,282 GWh in FY22. The two variants modeled by the DOE forecast the following paths out to FY2051:

In the Mid case, sales decrease to 14,240 GWh in FY30 and to 13,192 GWh in FY51, a decrease of 1,048 GWh, or 7.4% relative to FY30, with EVs accounting for 2% of electricity sales in FY30 and 16% in FY51. The graph below shows the projected load decline in the Mid case.


Source: PR100 Summary, p. 16.

In the Stress case, sales are projected to increase to 16,537 GWh in FY30 and to 18,422 GWh in FY51, an increase of 1,885 GWh, or 11.4% relative to FY30, with EVs accounting for 2% of sales in FY30 and 12% in FY51. The graph below shows the projected load increase in the Stress case (PR100 Summary, p. 15).


Source: PR100 Summary, p. 16.

Notice that the difference between both trajectories is 5,230 GWh by FY2051, equivalent to 32% of actual total electricity sales in FY22. This is a huge margin of error, which unfortunately is inevitable given the nature of the exercise.

The DOE by modeling a Stress case with increasing load appears to be suggesting that decision-makers in Puerto Rico could be underestimating future loads and should take into account the Stress scenario in their planning. This is an interesting suggestion, given a recent op-ed published in El Nuevo Día by Dr. Ramón Cao, a former professor of econometrics at the University of Puerto Rico, suggesting that the Financial Oversight and Management Board for Puerto Rico (“FOMB”) could be overestimating demand for electricity over the next 25 years in the forecasts it has filed with the federal court in connection with PREPA’s Plan of Adjustment. Just to be clear and for the avoidance of doubt, we are not suggesting one estimate is better or more accurate than the other. We are simply pointing out the radical uncertainty surrounding these long-term forecasts.

Given this level of uncertainty, we recommend that representatives of the DOE, the FOMB, Genera, LUMA, PREPA, and the Puerto Rico Energy Bureau (“PREB”) meet and seek agreement on a single set of forecasts out to 2050 and that the same projections be used for both the development of PREPA’s new Integrated Resource Plan (“IRP”) and in PREPA’s financial Plan of Adjustment that will be eventually certified by the federal court. It would be irrational to use one set of load forecasts for operational planning purposes (the IRP) and another for financial planning purposes (the Plan of Adjustment). 

At this time, though, we do need more information about the methodology used by the DOE to forecast electricity demand over the long term in order to reach any conclusion regarding the reasonableness of its estimates. Specifically, we need to know whether the DOE estimated demand functions for commercial, industrial, and residential users; the price elasticities used and how they were calculated; and additional information regarding their energy efficiency estimates. We hope this additional information will be available in the Final Report of the PR100 Study to be issued in late March.

In sum, the key finding here is that there is significant uncertainty regarding future electric load in Puerto Rico. According to the DOE modeling, final demand by FY2051 could be as low as 13,192 GWh or as high as 18,422 GWh. Further information is needed to analyze the reasonableness of these results.

Renewable Capacity Expansion

After forecasting loads out to 2050, the DOE then proceeded to model capacity expansion to find the lowest-cost system for each scenario while meeting load requirements. The first key finding here is that even if all six tranches of PREPA’s renewable energy generation and storage plan are executed as intended (something that will NOT happen as PREPA is already at least two years behind schedule in executing this plan), significant new investment in additional generation capacity, “on the scale of hundreds of megawatts”, is needed immediately to achieve “acceptable reliability performance” (PR100 Summary, p. 21). It is not clear from the PR100 Summary exactly how much new capacity is needed nor how such investment would be financed in the short term.

In order to achieve the 40% goal of renewable energy by 2025, “the optimal expansion planning results include 2,600—3,500 MW of utility-scale capacity, depending on the scenario, along with approximately 700 MW of 4-hour duration utility-scale batteries, 260—400MW of long-duration storage, and 170—340MW of land-based wind” (PR100 Summary, p. 21). During this phase, much of the existing fossil-fueled generation remains in place.

The chart below sets forth the modeling results by scenario to achieve 40% renewable energy generation by 2025:


Source: PR100 Summary, p. 21.

We note that the DOE asserts that “the current pace of utility-scale deployment is likely too slow to result in 40% renewable energy by the 2025 statutory deadline and a reliable grid in the near term” (PR100 Summary, p. 21). Thus, there appears to be another tradeoff, in this case between meeting the 40% goal by 2025 and achieving acceptable grid reliability in the short-term.

To achieve 100% generation from renewables by 2050, the “optimal mix of resources includes the addition of energy storage and biodiesel engines to serve system energy demands during periods of low wind and solar output” (PR100 Summary, p. 22). According to the DOE, “once all fossil-fueled plants are retired the system requires some biodiesel engine capacity (or a similar alternative resource) that can operate for prolonged periods.” To our knowledge, the requirement to use biodiesel engines by 2050 to meet demand during periods of low wind and solar output is new. We are not familiar with this technology and would need more information before reaching any conclusions regarding the feasibility of its future use in Puerto Rico for the generation of electric power.

The chart below sets forth the total annual electricity generation by scenario to meet 100% renewable generation by 2050:


Source: PR100 Summary, p.22.

Finally, the DOE found that curtailment (reduction) of solar generation capacity in 2050 is “notable.” According to the PR100 Summary, “the expectation is that variable sources of renewable energy are curtailed somewhat regularly to balance the system; this is a common finding in 100% renewable energy studies and is still the least-cost system solution” (PR100 Summary, p. 23).

The main findings with respect to rollout of renewable generation in Puerto Rico are: (1) there is a need for hundreds of MW of new generation capacity in the immediate term to ensure grid reliability; (2) the current pace of utility-scale solar deployment is too slow to meet the 40% goal by 2025; (3) the optimal resource mix suggested by the DOE to meet the 100% objective includes generation from biodiesel engines; and (4) curtailment of significant solar capacity appears to be necessary to balance the system in the long-term.

Transmission and Distribution Issues

It is well-known that Puerto Rico’s transmission and distribution system (“T&D System”) has severe problems. In this section, we highlight two issues that were identified by the DOE.

On the transmission side, the DOE found that the lower-voltage (38-kV) transmission network components are insufficient to handle the projected system transitions because “the number of new generation interconnections and amount of distributed generation capacity significantly alters the flow patterns on the local transmission infrastructure that is predominantly served by 38-kV assets” (PR100 Summary p. 23). Furthermore, several mitigating actions are required to “avoid frequent and debilitating 38-kV network overloads even at 40%-50% renewable energy”, regardless of the scenario (PR100 Summary, p. 24). Therefore, this is an issue that will need to be addressed relatively soon if Puerto Rico is serious about meeting the 100% renewable goal by 2050.

On the distribution side, the DOE found that (1) some feeders in Puerto Rico today operate outside the standards of the American National Standards Institutes Range A voltages, even with no solar PV generation; and (2) “uncontrolled distributed PV capacity under PR100 Scenarios 1, 2, and 3 was found to exceed 65%-95% of the studied distribution feeders’ hosting capacities, due to issues such as backfeeding and PV-caused voltage violations” (PR100 Summary, p. 28).

With respect to the first issue the DOE assumed that those feeders would be corrected to operate within American National Standards Institutes Range A voltages. The PR100 Summary does not include an estimate of the cost of carrying out these repairs nor of any financing sources available to pay for them. To address the second issue, the DOE identified several mitigation strategies that were found to eliminate “nearly all” of the negative impacts of high distributed PV generation.

The main finding here should not be surprising to anyone familiar with Puerto Rico’s power grid. Significant work needs to be done to bring the island’s T&D System up to 21st-century standards even as Puerto Rico begins the transition to achieve 100% renewable generation by 2050.

Economic Impact Analysis

The transition to 100% renewable energy is costly. New investment is needed to improve the T&D System, bring online new generation capacity, acquire and install large-scale battery storage systems, and build out the necessary infrastructure (access roads, new interconnections with the T&D System, etc.) to achieve the statutory objective by 2050. All this new investment needs to be financed in some way.

In this section, we will look at the principal findings set forth in the PR100 Summary regarding the economic impact of making the required investments to achieve full renewable generation. By definition, the findings in the PR 100 Summary are incomplete, as it is only a summary of the full study. It does not include an analysis of the reduction in the social burden and environmental costs associated with the transition to 100% renewables nor does it present the full results of its economic analysis or the methodology for executing that analysis. The PR100 Summary is also remarkably silent as to financing alternatives, a topic we will take up in the next section.

Notwithstanding those limitations in the content of the summary, the DOE is quite clear upfront about the magnitude of the costs involved. The DOE “found that the utility-incurred costs to transform Puerto Rico’s electric grid to one that is reliable will be significant regardless of the mix of generation technologies” (PR100 Summary, p. 28). The PR 100 Summary presents the cost estimates for two scenarios (1) Scenario 1, Less Land, Stress Load (“1LS”) and (2) Scenario 3, Less Land, Stress Load (“3LS”).

In general, the principal finding is that the “utility must charge substantially higher all-in average retail rates in Scenario 3LS than Scenario 1LS because the former has 20% less utility-sold electricity than the latter” (PR100 Summary, p. 28). The charts below show the revenue required by the utility in order to cover its costs under the two scenario variations as well as an estimate of the all-in average residential rate over time in 2021 dollars.


Source: PR100 Summary, p.29

The yellow line shows how the all-in average retail rate evolves over time as new investments are made to achieve the 100% renewable objective. Under both scenarios there is a sharp increase in average retail rates between 2020 and 2025, estimated to be between 66% and 83%, driven by several factors (1) investments in the near term to achieve resource adequacy and grid stability; (2) the procurement of new renewable generation and storage systems; (3) the need to keep using fossil fuel generation while ramping up renewable generation at the same time; (4) the costs of new energy efficiency programs; and (5) the costs of paying PREPA’s legacy debt and pension obligations. We note that under scenario 1LS, the average retail rate per kWh increases from approximately 21 cents in 2020 to about 34 cents by 2025; while under scenario 3LS the average retail rate per kWh increases to approximately 38 cents by 2025 in 2021 dollars.

After this initial period, costs stabilize and utility revenue requirements decline between 9% and 24% during the period between 2025 and 2045, as fossil-fuel generation is retired and replaced by renewable capacity, which lowers fuel and other associated costs over time.

Finally, between 2045 and 2050 “the system experiences notable cost increases that would be incurred by any system moving from already high levels of renewable energy to 100% renewable energy” (PR 100 Summary, p. 29). According to the DOE, this cost increase is due to the retirement of any remaining fossil-fuel generation units and replacing “the firming and balancing function they perform at high levels of renewable energy (i.e., supplying energy only on an as-needed basis when renewable generation is low and storage reserves are exhausted, for example during periods with several cloudy days in a row)” (PR 100 Summary p. 29). The estimated impact on the all-in average retail rate of this cost increase is estimated to be between 11% and 17% (PR100 Summary, p. 30).

Under both scenarios, then, there is a sharp increase in the all-in average retail rate in the short-term, followed by a period of relative rate stability during the medium to long term, and then another significant increase as the final push to 100% renewable generation is made during the 2045-2050 period.

While we don’t have access yet to the full economic analysis carried out by the DOE, we can assert with a high degree of confidence that an increase of 66% to 83% in the average retail rate in the short term would have severe, materially adverse effects on the Puerto Rican economy, in terms of GNP, GNP growth, employment, consumption, and income for several reasons. First, the Puerto Rican economy is just recently finding its legs after a prolonged period of secular stagnation. Second, the post-disaster reconstruction of the island’s infrastructure has been delayed and it is still an ongoing process. Finally, if we focus specifically on residential customers, the electricity cost share of wallet (electricity expenditures as a percentage of household median income) in Puerto Rico is already the highest in the United States and among the highest in the Caribbean region as shown in the chart below:


Source: FOMB, 2023 Certified Fiscal Plan for the Puerto Rico Electric Power Authority, p. 44.

An increase in the retail rate of the magnitude estimated by the DOE is simply not economically feasible given the current state of the Puerto Rican economy. This means that it will be necessary to mitigate this impact, either through subsidies, extending the timeline for achieving the transition to 100% renewables, a different technology mix, or through other policies.  

The DOE also executed an analysis of the net impact of the transition to 100% renewable generation on real household income (“HHI”) in Puerto Rico. Presumably, that analysis takes into account both the costs associated with the transition to renewables as well as any positive income and employment effects associated with the new investment needed to carry it out. The chart below shows the real HHI effects (in millions of dollars) of six scenarios for all years through 2050:


Source: PR100 Summary, p. 30.

As expected, the short-term impact of the transition on HHI is negative, followed by a modest positive impact between 2025 and 2045, and then a significantly positive effect by 2050. Note that if HHI decreases over the short term it is highly probable that consumption expenditures, employment, and real GNP will also decrease over the same period. However, we don’t have information at this point regarding the magnitude of those additional short-term economic effects.

Finally, we note that Scenario 3LS, which maximizes roof-top solar installations, uses less land, and assumes stress load conditions, produces the largest negative impact on HHI in the short term, and has a modest positive effect on HHI between 2025 and 2035, followed by a modest negative impact between 2040 and 2050. By 2050, however, it will have the largest positive effect on HHI. Therefore, there is a clear tradeoff in this scenario between economic costs to be incurred in the short term and economic benefits to be realized in the long term. Policymakers will have to take into account this explicit tradeoff when deciding which scenario to implement.

Financing the Transition

The PR100 Summary provides little information regarding the potential sources for financing the transition to 100% renewables. Footnote 2 on page 1 of the PR100 Summary sets forth the following sources of federal financing (“obligated funds”) for restoring and building a more reliable and resilient energy system for Puerto Rico:

  • FEMA Hazard Mitigation Assistance: $7.8 billion
  • FEMA Public Assistance: $9.5 billion
  • HUD Community Development Block Grant (“CDBG”) funds (Electric Grid): $1.9 billion
  • HUD CDBG Community Energy and Water Resilience Installations Program: $800 million
  • DOE Puerto Rico Energy Resilience Fund: $1 billion

Thus, a total of $21 billion in federal funds has been “obligated” to improve Puerto Rico’s electric system. Most of that money, approximately $19.2 billion, or 91%, has been earmarked for improving the T&D System. The rest has been used so far to finance the installation of rooftop solar systems. The PR100 Summary, however, does not state whether these amounts are sufficient to cover all the repairs needed to upgrade the T&D System. With respect to new generation capacity, it is already known that additional resources are needed to finance rooftop solar and battery systems as well as utility-scale solar PV and wind generation systems.

We note that there is a political risk that arises from depending solely or mostly on federal funding for modernizing the grid and financing DERs for low-income households. It is possible, under certain circumstances, to rescind the obligation of federal funds (sometimes referred to as the “deobligation” of funds). The political risk would arise in the event that Donald Trump wins the next presidential election in November 2024.

The first Trump Administration imposed unduly burdensome requirements on Puerto Rico and significantly delayed the obligation of CDBG funds, as evidenced by a report issued by the Office of the Inspector General of the Department of Housing and Urban Development and other sources. A Trump victory in November could put at risk funding not only for the modernization of the grid but for the entire reconstruction process. Puerto Rico would be well advised to plan for such an eventuality by identifying and designing litigation, public advocacy, and political lobbying strategies in advance of the coming election.

Finally, it would be useful if the final PR100 Study included a breakdown, by scenario and system segment (transmission, distribution, generation, energy storage, access infrastructure, etc.), of (1) all the capital expenditures required to achieve the 100% goal by 2050 and (2) of potential financing sources for each of these expenditures. We also propose that COR3/LUMA or perhaps the DOE publicly disclose all relevant information regarding the allocation of approved federal funding.

Conclusion

The PR100 Summary appears to present a good preview of the findings of the PR100 Study. From the Summary it seems that the PR100 Study is a thorough and thoughtful analysis carried out by a respected group of stakeholders. It is a welcome contribution to the public debate and a valuable resource for those who analyze and study Puerto Rico’s electricity system.

In our view, these are some of the most important findings:

  • It is feasible to achieve the objective of 100% renewable energy generation in Puerto Rico by 2050 without using agricultural lands for developing utility-scale generation.
  • The 100% objective can be met using “mature” technologies such as utility-scale PV, distributed PV, and land-based wind (but see caveat regarding biodiesel fuel below).
  • Regardless of scenario, Puerto Rico needs to make significant investments in the T&D System and new generation capacity just to improve system stability and reliability in the immediate term.
  • There are significant tradeoffs between resilience (Scenario 2 and 3) and energy affordability (Scenario 1); between land use and energy affordability (“less land scenarios” tend to be more expensive); between meeting the 40% goal by 2025 and achieving acceptable grid reliability in the short-term; and between incurring short-term costs to obtain long-term benefits, depending on the scenario to be implemented.
  • In general, scenarios with higher deployment of DERs using less land tend to be, on average, more expensive than other scenarios, result in higher rates for the consumer, and induce greater short-term adverse effects on the Puerto Rican economy.
  • The existence of these tradeoffs raises the question of which agency or entity should be in charge of making these decisions. We strongly recommend that the PREB be in charge of making these decisions.
  • The levelized cost of electricity on average would be $79/MWh under the Less Land variant and $75/MWh under the More Land variant. A difference of $4/MWh, or 5.33%, which over some 25-odd years is quite significant.
  • Decisionmakers could be underestimating long-term electricity loads and should take into account this risk when planning for the long term.
  • The difference between the Mid case and the Stress case variants is quite significant, some 5,230 GWh by FY2051. This is a large margin of error and the uncertainty regarding this forecast should be taken into account when drafting the next IRP and PREPA’s Plan of Adjustment.
  • Given this level of uncertainty, we recommend that representatives of the DOE, the FOMB, Genera, LUMA, PREPA, and the PREB meet and seek agreement on a single set of forecasts out to 2050 and that the same projections be used for both the development of PREPA’s new IRP and in PREPA’s financial Plan of Adjustment that will be eventually certified by the federal court. It would be irrational to use one set of load forecasts for operational planning purposes (the IRP) and another for financial planning purposes (the Plan of Adjustment).
  • The DOE estimates that the current pace of utility-scale solar deployment is too slow to meet the 40% renewable energy goal by 2025.
  • According to the DOE, the optimal resource mix to meet the 100% objective includes generation from biodiesel engines. This appears to contradict the DOE’s prior finding that it is feasible to attain the 100% renewable generation goal using only “mature” technologies. However, we need additional information about the commercial viability of this fuel source, a list of potential suppliers, and a procurement analysis, among other things, to determine whether biodiesel is a good long-term option for Puerto Rico.
  • The economic cost of the transition to 100% renewable energy by 2050 is quite significant, regardless of the scenario.
  • According to the DOE, the all-in average retail rate would increase between 66% and 83% between 2020 and 2025 in 2021 dollars, depending on the scenario.
  • A rate increase of this magnitude would have severe, material adverse effects on the economy of Puerto Rico in the short term and is simply not economically feasible. It will be necessary to mitigate these negative effects, either through subsidies, an extension of the timeline for achieving the transition, a different technology mix, or through other policies.
  • The DOE estimates that the short-term impact of the transition on household income is negative, followed by a modest positive impact between 2025 and 2045, and then a significantly positive effect by 2050. We note that if household income decreases over the short term it is also highly probable that consumption expenditures, employment, and real GNP will decrease over the same period. However, we don’t have any information at this point regarding the magnitude of these additional short-term economic effects.
  • The PR100 Summary provides remarkably little information regarding the sources for financing the full transition to 100% renewable energy by 2050.
  • Finally, a Trump victory in November could put at risk funding not only for the modernization of the grid but for the entire reconstruction process. Puerto Rico would be well advised to plan for such an eventuality by identifying and designing litigation, public advocacy, and political lobbying strategies in advance of the 2024 election.

In addition, we find that more information is needed in the following areas:

  • Load Forecasts: we need more information about the methodology used by the DOE to forecast electricity demand over the long term in order to reach any conclusion regarding the reasonableness of its estimates. Specifically, we need to know whether the DOE estimated demand functions for commercial, industrial, and residential users; the price elasticities used and how they were calculated; and additional information regarding their energy efficiency estimates.
  • Biodiesel Fuels: We are not familiar with this technology and need more information before reaching any conclusions regarding the feasibility of its future use in Puerto Rico for the generation of electric power.
  • Economic Impact Analysis: We need more information regarding the economic impact of rate increases in the short term on GNP level, GNP growth, employment, income, and consumption expenditures in order to assess the economic feasibility of the different scenarios.
  • Total Capital Expenditures and Sources of Financing: it would be useful if the final PR100 Study included a breakdown, by scenario and system segment (transmission, distribution, generation, energy storage, access infrastructure, etc.), of (1) all the capital expenditures required to achieve the 100% goal by 2050 and (2) potential financing sources for each of these expenditures.

CNE Review – March 2023

Published on March 16, 2023 / Leer en español

See all editions of the
CNE Review
SHARE

SPECIAL EDITION

Puerto Rico’s Energy Transformation
and the Genera Agreement

In this edition of the CNE Review, we take a look at the ongoing transformation of Puerto Rico’s electricity sector. First, we present a summary of the following ongoing processes: the restructuring of PREPA’s debt, the reconstruction of Puerto Rico’s energy system, the transition to a new grid operator, and Project PR100. That update is followed by a policy brief that examines what has come to be known as “the Genera contract” or the Puerto Rico Thermal Generation Facilities Operation and Maintenance Agreement. Our Policy Director analyzed over 600 pages between the contract, Partnership Committee Report, and other complementary documents in detail to highlight the transaction’s most critical aspects for our readers.CNE has consistently delivered the most comprehensive analysis of PREPA’s transformation processes providing non-partisan research, insights, and recommendations to policymakers, media outlets, and the public. This valuable work is only possible thanks to our sponsors. Thank you for supporting our work.

Puerto Rico’s Energy Transformation: Where are we now?

By Sergio M. Marxuach, Policy Director

Access to affordable, clean, and reliable electricity is necessary for the long-term sustainable growth of the Puerto Rican economy. This transformation process began in earnest with the enactment of Act 57 of May 17, 2014, which created the Puerto Rico Energy Commission (now the Puerto Rico Energy Bureau) to regulate the generation, transmission, distribution, and sale of electricity in Puerto Rico. Since then, other laws and regulations have been enacted to establish Puerto Rico’s long-term energy policy; require the unbundling of the vertically integrated operations of the Puerto Rico Electric Power Authority (“PREPA”); and expand the installation of generation capacity using renewable energy sources. In fact, Puerto Rico has committed to meeting its electricity needs with 100% renewable energy by 2050, along with realizing interim goals of 40% by 2025, 60% by 2040, the phaseout of coal-fired generation by 2028, and a 30% improvement in energy efficiency by 2040. In addition to all that legislative and regulatory activity, the following processes are currently ongoing:

Restructuring PREPA’s Debt – After years of mismanagement, PREPA (through the Fiscal Oversight and Management Board, “FOMB”) filed a petition to restructure its financial obligations through the bankruptcy-like procedure provided by Title III of the Puerto Rico Oversight, Management, and Economic Stability Act (“PROMESA”) in July 2017. After six years of tough negotiations, a majority of the creditors have not reached a consensual agreement with the FOMB. On February 9, 2023, the FOMB filed an amended proposed Plan of Adjustment to reduce PREPA’s obligation approximately by 50%. Given the lack of agreement among the parties, it is likely that some of the underlying legal issues will have to be litigated before any proposed plan of adjustment is confirmed by the Court. This litigation process, including any appeals, could take an additional 12 to 18 months.

Reconstruction of Puerto Rico’s Energy System – Hurricane Maria devastated Puerto Rico’s electric system in September 2017. The federal government, through FEMA and HUD, has allocated approximately $12 billion, mostly for the reconstruction of the electric grid. However, according to data from the Puerto Rico Central Office for Recovery, Reconstruction, and Resiliency, only 18 permanent work reconstruction projects in the energy sector, totaling $88,741,190, had been completed as of March 6, 2023 (see the chart below for more detail). At this pace, it would take over 100 years to complete the reconstruction of the Puerto Rico electric grid. To be fair, the delay in spending these funds has been partly due to the imposition of burdensome and sometimes unprecedented federal bureaucratic requirements on Puerto Rico. Nonetheless, more than five years after Hurricane Maria the amount of money spent on rebuilding the electric grid remains eye-watering small.


Source: Puerto Rico Central Office for Recovery, Reconstruction and Resiliency Transition to a New Grid Operator – On June 22, 2020, PREPA, the Puerto Rico Public-Private Partnerships Authority (the “P3 Authority”), LUMA Energy LLC, and LUMA Energy ServCo, LLC (“LUMA”), entered into a Transmission and Distribution Operation and Maintenance Agreement (the “T&D O&M Agreement”), pursuant to which LUMA will operate, maintain, and modernize PREPA’s transmission and distribution system, during a period of 15 years. The transition from PREPA to LUMA has been tempestuous, to say least, due partly to the inexperience of the government of Puerto Rico in managing these kinds of agreements and partly to LUMA’s arrogance and its misjudgment of the complexity and the difficulty of the tasks it was agreeing to undertake pursuant to the T&D O&M Agreement. However, the electric grid, which to be fair is in quite a poor condition, appears to have stabilized since the beginning of 2023. Project PR 100 – On February 2, 2022, the U.S. Department of Energy (“DOE”) launched the Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (“PR100”). This is a “2-year study by DOE’s Grid Deployment Office and six national laboratories to comprehensively analyze stakeholder-driven pathways to Puerto Rico’s clean energy future. PR100 entails five activities, with an emphasis on modeling and analyzing scenarios that meet Puerto Rico’s renewable energy targets and achieve short-term recovery goals and long-term energy resilience.” In January 2023, the DOE presented a one-year progress report. The final report and recommendations are expected to be made public by December 2023 or early 2024.

Insights + Analysis from CNE

Analysis of PREPA Legacy Assets Public-Private Partnership Agreement

By Sergio M. Marxuach, Policy Director

On January 24, 2023, the Puerto Rico Power Electric Authority (“PREPA” or the “Owner”), the Puerto Rico Public-Private Partnerships Authority (the “P3 Authority” or the “Administrator”), and Genera PR LLC (the “Operator” or “Genera”), executed the Puerto Rico Thermal Generation Facilities Operation and Maintenance Agreement (the “Agreement”) setting forth the terms and conditions pursuant to which the Operator will operate, maintain, and eventually decommission certain Legacy Generation Assets owned by PREPA. The execution of this Agreement is the most recent step in the long-term transformation of the Puerto Rico electricity market. In the Policy Brief, we present an analysis of the principal components of the Agreement, including the basic structure of the transaction; the compensation of the Operator (including any incentives and penalties provided for therein); the estimated savings to be generated as a result of hiring a private operator to operate and maintain the Legacy Generation Assets; the planned decommission of most of the existing facilities that currently use fossil fuels to generate electricity in Puerto Rico; and the resulting structure of Puerto Rico’s electricity market. Keep scrolling for some highlights.

The Structure of the Agreement

Energy costs in Puerto Rico are very high since we depend on old power plants that burn mostly fossil fuels, which represents 70% of operational costs. The Agreement lays out the blueprint for a transition to renewable energy generation (and/or natural gas and hydrogen) which could provide a significant reduction in the cost of energy in the long term, depending on how this difficult and complex process of decommissioning fossil fuel generation while simultaneously deploying large scale renewable generation is implemented. The 300+ page contract lays out the terms and conditions pursuant to which Genera will operate, maintain and eventually decommission certain power plants.Genera was hired to provide, directly or through subcontractors, four types of services: Mobilization Services, Operation and Maintenance Services, Decommissioning Services, and Demobilization Services. In exchange for providing these services, the Operator is entitled to receive certain compensation, subject to any applicable incentive payments or penalties.

The Expected Savings

The government of Puerto Rico has stated that it expects this Agreement to generate significant savings. Yet, in the short term, the savings estimated by Genera will be insufficient to provide any savings to consumers even if PREPA’s debt is cut approximately by 50% to $5 billion and pays 6% interest, which means consumers will need to pay $300 million annually to service the restructured debt. Genera estimates, as set forth in a report by FTI Consulting, that the “combined estimated savings from O&M and fuel range from $100 million to $200 million annually (including fuel conversion savings if approved by PREB).” Under the terms of the Agreement, those “savings would be shared 50%/50% between Genera and the consumers of Puerto Rico. That would result in $50 million to $100 million per year to Puerto Rico electric system customers.” The methodology used by Genera to calculate those expected savings is not provided in the FTI report, so it cannot be properly evaluated. Genera insists on pointing to potential savings to be extracted from the conversion of oil-burning plants to facilities that burn natural gas. Such conversions would generate approximately 50% of total expected savings from the agreement. Given that Genera is a wholly-owned subsidiary of New Fortress Energy, a company that produces and delivers natural gas a clear conflict of interest arises. The Agreement, however, includes a fully-developed policy to address organizational conflicts of interest. It remains to be seen how thoroughly will that policy be enforced and implemented. In addition, the Agreement does not identify who would pay for the capital expenditures necessary for such conversions nor does it explain how expected savings will be affected once the cost of capital is taken into account.

Pros and Cons

Several elements of the new agreement are clearly superior to the LUMA Agreement. Among these we can mention:

  • a well-developed system of incentives and penalties to motivate the Operator;
  • the inclusion of clear benchmarks to measure Genera’s performance;
  • stronger filters to analyze transactions with affiliates and related parties, including a fully fleshed-out policy to address organizational conflicts of interest;
  • the requirement to engage in good faith negotiations with current PREPA employees so as to minimize the learning curve of the new operator; and
  • setting a cap on the fees that the Operator can earn during the Mobilization Period.

All point to the conclusion that this is an agreement that offers better protections to the people of Puerto Rico from some of the foreseeable risks associated with this transaction. Other aspects of the agreement are not as good. For example:

  • most of the services will be provided by subcontractors (wouldn’t it be more efficient just to contract directly with them?);
  • the analysis of the expected savings is clearly deficient and we would like to see a more rigorous examination of those professed savings; and
  • it is not clear to us that the resultant market structure will lead to lower prices, generate allocative efficiencies, and/or produce significant increases in consumer welfare.

Of Note: Buy Local Provisions

A novel feature of the Agreement is that it requires Genera to use “commercially reasonable” efforts to ensure that local companies, or foreign companies with a significant presence in Puerto Rico, are included in the procurement process for materials and services under the agreement. In addition, it requires Genera to use “commercially reasonable” efforts to select companies established under the Commonwealth of Puerto Rico or companies that have “a significant presence in the Commonwealth of Puerto Rico” as material subcontractors. These provisions, if implemented, have the potential to generate local economic activity and allow local firms and workers to obtain valuable experience working on a complex multi-year project.

So, relative to the status quo, is the post-Genera electricity market in better shape in Puerto Rico?

Probably yes, but that is an awfully low bar. Everybody who has objectively analyzed PREPA’s performance over the last 30 or 40 years has concluded that it is a mess, the financial and operational equivalent of a long-smoldering dumpster fire. By that standard, trying anything new, no matter how outlandish it may seem, would probably constitute progress. However, if we set a higher bar, if we ask whether this transaction will really help Puerto Rico achieve its long-standing goals of generating affordable, cleaner, and reliable electricity, then the answer is not quite as clear, for the good is indeed mingled with the ill. The fact is that there is a lot uncertainty surrounding this transaction and it is hard to avoid the unsettling feeling we are being presented with a fait-accompli on a take it or leave it basis. Maintaining the status quo, though, is not an option. The real question is whether there is a better alternative to a negotiated agreement in this instance. The answer, when taking into account the totality of the circumstances, appears to be no. The available alternatives seem to be (1) worse, for example, resuscitating PREPA; (2) unrealistic, entailing, for instance, the creation of a new Tennessee Valley Authority-like entity to provide electricity in Puerto Rico; or (3) downright utopian, involving extremist schemes reminiscent of Mao’s Great Leap Forward.After assessing the risks and benefits of the Generation O&M Agreement we face a dilemma in the classical sense of making a decision with no good options. But in a situation with no objectively good options, taking a calculated risk may, perhaps, be the best option.

On Our Radar…

Interest Rates – Jay Powell, Chair of the Board of Governors of the Federal Reserve System, recently testified before the Committee on Banking, Housing, and Urban Affairs of the U.S. Senate. In his statement, Mr. Powell reiterated the Federal Reserve’s commitment to keeping inflation at 2% over the long run. However, “with inflation well above our longer-run goal of 2 percent and with the labor market remaining extremely tight, the FOMC has continued to tighten the stance of monetary policy, raising interest rates by 4-1/2 percentage points over the past year. We continue to anticipate that ongoing increases in the target range for the federal funds rate will be appropriate in order to attain a stance of monetary policy that is sufficiently restrictive to return inflation to 2 percent over time.” In plain English, this means the Federal Reserve will keep increasing interest rates until inflation decreases to its policy target of 2%. The real question is whether the Fed will be able to accomplish this without triggering a recession. Only time will tell.

The Debt Limit – On January 19, 2023, the United States reached its statutory debt limit of $31.4 trillion “and the Treasury announced a ‘debt issuance suspension period’ during which, under current law, it can take well-established ‘extraordinary measures’ to borrow additional funds without breaching the debt ceiling.” The Congressional Budget Office estimates that “if the debt limit remains unchanged, the government’s ability to borrow using extraordinary measures will be exhausted between July and September 2023—that is, in the fourth quarter of the current fiscal year. The projected exhaustion date is uncertain because the timing and amount of revenue collections and outlays over the intervening months could differ from CBO’s projections.” House Republicans have stated they will not vote to increase the debt limit unless the Biden administration agrees to broad-based spending cuts (which may or may not include defense spending depending on who you ask on the Republican side). The White House, for its part, has stated it will not negotiate anything other than a “clean” debt limit bill. That is, a bill increasing the debt limit without any spending cuts attached. So far, both parties are holding fast to their initial positions. A recent report from Moody’s Analytics concludes that the failure to increase or suspend the debt limit would have dire consequences on the U.S. and global economy.

Medicare Solvency – The Biden Administration has announced a proposal to extend the solvency of the Medicare program by at least 25 years by (1) increasing the Medicare tax rate on income over $400,000; (2) closing loopholes in existing Medicare taxes; and (3) crediting savings from prescription drug reforms to the Medicare Hospital Insurance Trust Fund. So far, the Republicans in Congress appear to be uninterested in pursuing this path.